TEMLOC Safety Guidelines Caution: Some parts have sharp edges. Protective wear, such as gloves, must be worn when handling building parts. Please read all safety instruction before beginning project. General understanding of making a building square and plumb is required in order to assemble a Temloc building. REV.
TEMLOC Safety Guidelines Assembly Instructions Before beginning assembly-check with your local jurisdiction about building code requirments. Assembly teammate TEMLOC recommends that a minimum of two adults assemble the building together. Do not attempt to assemble this building alone. Personal Safety and Protections Take care of your personal safety by wearing eye protection, hand protection, foot protection and protective clothing.
TEMLOC Site Selection Guidelines Site Selection There are several considerations you need to take into account when selecting the site for your building. Check with your local jurisdiction about building code requirements. Below is a limited list of considerations when choosing a site: 1. Proper drainage away from the perimeter of the building. You may need to build up a pad, or adjust the grade so you create positive drainage and water will not run into the floor or foundation. 2.
TEMLOC Tool Guidelines Tools Required: • • • • • • • • • • • • • • REV.
TEMLOC Steel Storage Building Parts List Note: Numbers on this page correspond to item numbers On packing list 6
TEMLOC Steel Storage Building Parts List Note: Numbers on this page correspond to item numbers On packing list 7
TEMLOC Steel Storage Building Parts List Note: Numbers on this page correspond to item numbers On packing list 8
TEMLOC Steel Storage Building Parts List Closed Cell Gasket QTY: 200 LIN Ft. #10 Pan Head Tek Screw QTY: 300 REV.
TEMLOC Steel Storage Building Parts List 4 Closure Strip Inside QTY: 15 Closure Strip Outside QTY: 15 REV.
TEMLOC Steel Storage Building Parts List Octagon Window QTY: 2 41 #2 Square Drive QTY: 1 42 Note: Numbers on this page correspond to item numbers On packing list 11
TEMLOC Steel Storage Building Parts List 12 x 1 Exterior Tek Screws QTY: 360 Wood to Metal Tek Screw QTY: 380 REV.
12 x 21 Floor Kit 21’ 4” Long (256”) Installation Instructions REV.
1. Assembly of Floor Joists A. B. C. D. Attach part 1 and 2 matching up holes Use #12x1 ext. tek screws F7 Part F2 goes over part F1 Assemble remaining floor joists REV.
1. Side Band Connections A. Attach long pieces using #12 ext. Tek screws F7 B. See drawing for detail C. Duplicate for right and left side 72” 64” 64” 56” REV.
1. Rail Assembly A. B. C. D. E. F. G. H. I. J. K. Mark the top of side bands at 16” on center starting at front of both sides Install end joist See detail at front there is double joist and a single at back Use #12 ext.
1. Layout Parts Helpful Hint: Laying out parts before assembly saves time. A. Layout all parts B. Before you start make sure your floor is square & level and measures 12’ wide x 21’ x 4” long C. Cross tape dimension for a square floor should be 24’ 5 ¾” REV.
1. Layout Z Base A. Attach Z Base to foundation using #10 Tek screws 32 B. See detail view for more instruction C. Opening width between part 4 & 5 is 7’0” Helpful Hint: Notice the critical dimension. This must be held. NOTE: Screw only to the decking. No screws in the vertical part of the Z Base. Start screws 2” from edge & spaced 12” between the rest with #10 tek screws. REV.
4. Pre assemble all the truss halves A. Use 5/16” bolts 30 and flange nuts 29 to attach truss halves 17 B. Align truss halves C. Attach splice 16 using #10 pan head Tek screws 31 D. See truss splice detail REV. 022014 Helpful Hint: Assemble the trusses on a level surface. Align the top and bottom before tightening. With a marker mark the purlin placement at 2” from the end and 39” from the end. See step 16.
5. A. B. C. D. Install wall panels Install the right corner panels 11 & 9 See corner panels layout view at bottom left corner of page Align the panels at the top & bottom Use #10 Tek screws 32 to attach panel 11 to panel 9 through pilot holes E. Use #10 Tek screws 32 to attach panels to floor through pilot holes F. Repeat for the left side Helpful Hint: Install one corner at a time. The 30” front wall piece first. That panel should line up on the floor base to hold to door opening true.
6. Install wall caps A. Place wall cap 14 & 15 on top of panels (these rest freely on top) B. Attach door header D2 to panels using #10 Tek screws 32 Fasten door header from inside of panel into header; Screw heads will be facing outside walls once installed through panel and header. **This keeps screws from interfering with roll-up door assembly** Helpful Hint: Top wall caps just sit on top of the wall panels until the header is secured. The solid surface of the header faces to the outside.
7. Wall panel install A. Attach closed cell gasket 28 to corner panel 8 B. Attach panel 8 to wall using (7) 5/16” bolts 30 and nuts 29 then tighten C. Align panel 8 even to floor D. Attach panel 8 to floor using #10 Tek screws 32 E. See bottom right hand detail F. Repeat on the other side REV. 022014 Helpful Hint: Always install closed cell gasket to the already installed panel before the panels are bolted together.
8. Install the top caps A. Install wall caps on both sides using the #10 tek screw 32 and fasten through the panel (one per wall panel) to hold wall in place B. Make sure the slot holes in the top cap line up with slots in panels and the cap is tight to outside, any slight gap can be to inside Helpful Hint: Notice the top caps extend past the panel. Align the holes before securing the top caps with Tek screws (one in each panel).
9. Install the truss A. B. C. D. Check wall for vertical alignment before attaching truss Drop the truss welded bolts into the holes in the top of panel Check vertical alignment (plumb) Use flange nuts 29 to secure truss and wall Helpful Hint: Check alignment (plumb) on the wall before tightening the truss bolts. REV.
10. Repeat steps 7 through 9 A. Repeat steps 7 through 9 until your structure resembles the drawing below REV. 022014 **At times alongside the walls, they will begin to bow before you install the roof trusses. Recommended to use a strap/tie-down from low spot on building to keep building walls square/plum** Helpful Hint: Following the sequence is critical. Work from right to left. Remember to gasket the stationary panel, bolt it, check alignment (plumb) and secure it to the floor.
11.1 Install the corner Panels A. B. C. D. Set panel 9 so inside is 30” from the 16’ side wall as noted Attach panel 9 to back floor using #10 Tek screws 32 Apply closed cell gasket 28 to stationary wall Attach panel 11 to panel 9 with #10 Tek screws 32 through pilot hole alignment is same as front wall corner E. Bolt in panel 11 to wall panel 8 REV. 022014 Helpful Hint: Set the back 30” panel first, mark the floor base at 30” to act as a guide.
11.2 Back wall A. Install closed cell gasket 28 on stationary panel 9 B. Install second panel 9 and bolt with 7 bolts 5/16” nuts 29 and bolts 30 to stationary panel 9 C. Attach panel 24 to panel 9 in similar fashion D. Install wall cap 25 by placing the cap on panel 9 no retaining screws will be used E. Continue to attach panel 9 to end of wall F. Attach panel 10 to panel 9 and to floor NOTE: Apply closed cell gasket for every joint and install 7 nuts and bolts per joint. REV.
11.3 Top panel cap install A. Place cap 26 on top of back wall B. These will rest on top with no screws REV.
12. Install last truss A. Refer to Step 9 REV. 022014 Helpful Hint: Check the wall alignment (plumb) before tightening bolts on truss.
14A. Assemble all gables A. B. C. D. E. Install closed cell gasket 28 on one side of gable halves (see below) Attach gable 18 to gable 19 using 5/16” nuts 29 and bolts 30 Apply roll caulk 27 around opening Press window to seal Fasten with #10 Tek screws 32 through pilot holes “ REV.
14B. Back wall gable install A. Set assembled wall gable on top of back wall B. Align gable with holes in panels C. Use 5/16” nuts 29 and bolts 30 to loosely attach gable to panels D. Bump the gable tight to the panels and check alignment (plumb) E. Use #10 Tek screws 32 through pilot holes on outside of gable F. Tighten 5/16” bolts REV. 022014 Helpful Hint: This step takes two step ladders and two people. Walk the gables up and set on top of the wall panels to align.
15. Front wall gable install A. Set assembled wall gable on top of back wall B. Align gable with holes in panels C. Use 5/16” nuts 29 and bolts 30 to loosely attach gables to panels D. Bump the gable tight to the panels and check alignment (plumb) E. Use #10 Tek screws 32 through pilot holes on outside of gable F. Tighten 5/16” bolts REV.
REV.
TEMLOC Steel Storage Building Door Parts List #10 Tek Screws (Painted) QTY: 40 7’ x 6’-7” Roll Up Door Note: Numbers on this page correspond to item numbers On packing list 34 D8
TEMLOC Steel Storage Building Door Parts List Box with Door Hardware QTY: 1 D11 Note: Numbers on this page correspond to item numbers On packing list REV.
1. Door Install A. Install D5 D4 pcs from the inside and tight to the panel B. Install HDR piece D2 with Tek screws flush to top and vertical face to outside. **Already done** C. Use #10 Painted Tek screws D8 . It also secures the D5 pcs at top, later they will be further attached through the D5 trim pieces (D4) pcs install by leaning top of pcs outward, pushing snug at bottom against front panel on floor then lean inwards towards door. Press pcs tightly into panel jam REV.
3. Install threshold A. Hem to inside so it will be slightly raised in back and sloped to the front B. Push D1 tight to deck in front and attach to front face joint Step 2 **Recommended to caulk seams at door** REV.
5. Install D3 A. For final top trim pc. It is inserted between gable face and panel then the door header seal REV. 022014 Step 3 Helpful Hint: Putting under the gable allows gable seal, no water gets inside.
4. Install trim A. Butt tight to opening. These cover the holes in the panel B. Add Hex #10 painted Tek screws D8 that go through trim panel and D5 pieces, 3 in each vertical piece Step 4 D5 D5 REV.
JANUS INTERNATIONAL 750 Series Door *DO NOT UNWRAP DOOR * NOTE: REFER TO JANUS SERIES 750 INSTALLATION GUIDE PROVIDED EXCEPT FOR JANUS STEP 4: LIFTING DOOR ASSEMBLY REV.
JANUS INTERNATIONAL 750 Series Door DO NOT UNWRAP DOOR ! Installation of door stop clips are required. Failure to properly install clips can cause the door curtain to travel beyond the guides resulting in door damage and or personal injury. ! DOOR MUST BE FULLY OPENED WHEN MAKING ADJUSTMENTS GENERAL A. Caution, use proper lifting procedures B. If you view the Janus procedures it shows bolting the door to the track and tilting it up.
NOTE: THIS IS THE ONLY STEP THAT DIFFERS FROM THE JANUS INSTRUCTIONS PROVIDED 2. Raise door A. Now you are ready to raise up the door and push tracks vertical. Note tracks sit on threshold B. Bolt track to building by locating 4 holes inside track. Using drill and extension to reach through track. Tighten all Tek screws before feeding door into track NOTE: Use the trim to align track vertically as you screw track in REV.
16. J-Cap Install A. Align J-Caps 22 & 23 to truss ang gables B. Attach J-Caps 22 & 23 to gables and truss using #10 pan head Tek screws 31 J-CAP INSTALLATION DETAIL Helpful Hint: J caps are on each side of the ridge. Use only pan head screws. Before installing J-Caps make sure truss is aligned (plumb).
16.17. Purlin Install Purlin Install A. A.Align J-Caps 22 20 & 23 to truss angand gables Align purlins & 21 to truss gables (first row starts 2” from B. Attach 23 to39” gables truss using #10 end, J-Caps second22 row&starts fromand end) head purlins Tek screws B.pan Attach 20 &3121 using #10 pan head Tek screws 31 C. Align purlins 20 & 21 to truss and gables (first row starts 2” from end, second row starts 39” from end) D. See detail below for measurements E.
REV.
TEMLOC Steel Storage Building Roof Parts List 80 1/2 80 1/2 14 Closure Strip Inside QTY: 15 8 Closure Strip Outside QTY: 15 REV.
35 REV.
1. Check for square A. Measure at the top corners & check that your building is square (see critical step below) B. Hold same point in all 4 corners C. Write the measurements down D. Shimming may be required on one corner of long dimension E. Eve trim 36 starts at the back wall flush to gable and tight to building F. Fasten with 1” roof screws 40 bottom up into truss overhang G. Overlap common joint secure both at same time Lap Lap Lap REV.
2. First roofing panel installation A. B. C. D. E. Start installing the roof Line up the first sheet with the edge of the gable Seat roofing inside the J-Cap – Seat firmly against the J-Cap Install outside closure 39 between roofing and J-Cap Install inside closure 38 at the eve between roofing eve trim (38) REV.
3. 2nd roofing panel installation A. Measure from the end of the roofing to the center of the purlin B. Screw using the spacing that TEMLOC provides in the drawing below REV.
4. Continue installing roof panels A. Work down the side of the building going in one direction B. The last Half-U-Panel 34 will have a double lap as shown below REV.
5. Repeat steps 1-4 on opposite side A. Repeat the process on the other side of the building REV.
6. Install gable trim A. Install roll caulk 27 onto first rib front and back B. Place gable trim on the caulk and fasten with 1” roof screws 40 end of trim and roof will not be flush C. With the other side installed, place the opposite gable trim on and mark where the piece needs to be cut to fit D. Cut the gable trim appropriately REV. 022014 Helpful Hint: One piece on one side is installed without cutting. The second is marked and cut as shown and overlaps.
7. Roof cap seal installation detail A. B. C. D. Roof cap seals are installed from the top of the roof Add roll caulk 27 to the tops of the J-Cap Install roof caps onto the top of the J-Caps Screw the rood caps down using 1” roof screw 40 , screws every 4th rib REV.
Parts List for TEMLOC 12’ x 16’ Building Model Number SHED-P-12-09-21-12-S REV. 022014 ITEM # PART # DESCRITPION ITEM # PART # DESCRITPION 1 ZTRIM-68-R Long Wall Z-Base 68" Long 22 TRS-CP-J-64 Roof Framing J-Caps 64.0" 2 ZTRIM-56 Long Wall Z-Base 56" Long 23 TRS-CP-J-64.375 Roof Framing J-Caps 64.
Parts List for TEMLOC 12’ x 16’ Building Model Number SHED-P-12-09-21-12-S REV. 022014 ITEM # PART # DESCRITPION 42 MSC-620 #2 SQ x 2" Driver F3 SB-6-64 Side Band 64" Long 43 ZTRIM-64-R FLOOR Z TRIM F4 SB-6-56 Side Band 56" Long 44 ZTRIM-64-L FLOOR Z TRIM F5 SB-6-72 Side Band 72" Long 45 TCP-52 TOP PANEL CAP F6 SBS-6-14.375 Side Band Splice 14.375" Long 46 TCP-56 TOP PANEL CAP F7 FAS-1835-50-KIT 12X1 EXT. Tek Screw (50 ea) 47 GBL-TRIM-81.