Operator Manual

SUPERVISOR CONTROLS
148
T17 9020160 (32019)
CHECKLIST SETUP
Checklist setup allows the checklist to be setup /
changed to meet machine usage demands.
1. Turn on the machine, login to the main
operation screen, and press the setting button
to access the supervisor settings screen. See
ENTERING THE SUPERVISOR MODE.
2. Press the Checklist Setup button to access
the PreOperation checklist setup screen.
3. Press the Select Questions button to access
the PreOperation Checklist master list
screen.
Press the down arrow button to scroll down
through PreOperation Checklist items.
Press the up arrow button to scroll up
through PreOperation Checklist items.
Press the check box button to select a new
checklist item to add to the checklist.
Press either the video help button to view
the video related to a particular
PreOperation Checklist item.
Press the Enter button to add the selected
PreOperation Checklist items(s) to the
PreOperation Checklist.
Press the help button to access the Pre
Operation Checklist help screen.
Press the back button to return to the Pre
Operation Checklist Master List screen.
4. Press the Every 24 hours button or the Every
Time button to set the interval the operator
must complete the PreOperation Checklist.
A check mark appears in the chosen interval.
Press the home button to navigate back to
the main operating screen.
Press the back button to navigate back to
the previous screen.