Instructions / Assembly
1
2
1
2
3
4
Step 4. DRYWALL Wall Preparation
Add +1 3/4” to the door height (H) and measure up from the floor to find
the height of the center of the track. Ensure a gap of 3/8" - 1/2" at the
bottom of the door and make marks on the wall on both the left and right
sides of the door opening. A minimum of 2” track clearance must be
maintained on both the left and right sides of the door opening.
Step 5. DRYWALL Wall Preparation
Use your guide marks to position the track in place, ensuring that it is level.
Mark the mounting holes on the track using a pencil. You do not need to
pre-drill the holes.
Step 6. DRYWALL Track Installation
When installing into the wall, insert using the provided wall screws. Align
each spacer to the track holes, inserting spacers and screws (with
washers), securing with a wrench.
Step 7. Hanging the Door
Place the assembled door onto the secured track and rotate each
anti-jump bumper so that if provides a buffer between the track and the
door. Test for proper operation by sliding the door side-to-side.
78 3/4 " (2000mm)
Minimum 2”
(51 mm)
3/8" (9.5 mm) –
1/2" (12.7 mm)
Gap under the
door
Door Height + 1 3/4"
H+1 "
16
11
1"