Installation Guide
Table Of Contents
- Installation Guide
- Table of Contents
- Chapter 1: Introduction
- Chapter 2: Installation Steps
- 2.1 Verify Controller Existence
- 2.2 Install WINTouch
- 2.3 Configure Connectivity Parameters for Nodes in POP Site
- 2.4 Check Connectivity to Nodes in POP Site
- 2.5 Check items to be installed
- 2.6 Prepare Tools
- 2.7 Install Standard Mounting Kit
- 2.8 Mount Nodes
- 2.9 Mount the ODU-S (optional)
- 2.10 Ground Nodes
- 2.11 Ground the ODU-S
- 2.12 Mount the Lightning Protection Units
- 2.13 Connect Node (External Connections)
- 2.14 Connect PoE (optional)
- 2.15 Waterproofing
- 2.16 Mount and Connect Client Nodes
- 2.17 Align Client Node
- Chapter 3: Safety Practices and Provisions
- Appendix A: Terminology
- Appendix B: About Antennas
- Appendix C: Certified Antennas
- Appendix D: Revision History
- RADWIN Worldwide Offices
TerraWINInstallationGuide DQ0266170/O.02 2‐19
MountandConnectClientNodes InstallationSteps
Figure2‐25:Applyingsealanttapetoanexternalconnection
2.16MountandConnectClientNodes
ClientNodesarephysicallyidenticalwithDistributionNodes.Theyaremountedand
connectedtopowerandcommunicationsinthesamemanner.
• TomountaClientNode,SeeMountNodesonpage 2‐8
• ToconnectaClientNodetopower,SeeConnectNode(Ex ternalConnections)on
page 2‐16
2.17AlignClientNode
• ConnecttotheunitviabluetoothusingWINTouch.
• PointtheClientNodeinthegeneraldirectionoftheclosestDistributionNode.
• FollowthedirectionsinWINTouchtoaligntheClientNode.Thiswillconsistofdoingthe
following:
a. Swiveltheunittotheleftslowly,totheright,andthenbacktowardsthe
DistributionNode.