User Manual
Table Of Contents
- IMPORTANT SAFETY INFORMATION
- PRODUCT OVERVIEW
- INSTALLATION
- In the Box
- Tools
- Installation Considerations
- Step 1: Prepare Wirebox for Conduit Fittings and Bushings
- Step 2: Prepare Mounting Surface
- Step 3: Prepare Wirebox and Mount to Wall
- Step 4: Route Wiring Through Wirebox
- Step 5: Strip and Land Wiring
- Step 6: Attach Wall Connector to Wirebox
- Step 7: Energize Wall Connector
- COMMISSIONING PROCEDURE
- POWER SHARING
- WALL CONNECTOR LEDS
- WARRANTY INFORMATION
- _
Step 4: Route Wiring Through Wirebox
1. Route wiring into selected entry point and through the service loop channel on the right side of the
wirebox.
Top Entry Bottom Entry Rear Left Entry Rear Right Entry
2. Use appropriate cable glands, bushings, or fittings to secure the wiring in place and protect from
water and debris intrusion.
CAUTION: Ensure that bushings are in place to avoid damage to conductors and ground wire
when pulled into wirebox.
CAUTION: Use copper conductors only.
NOTE: Compression-style fittings are recommended to prevent interference.
NOTE: For top or bottom wire entry, if installing fittings with a set screw, ensure that the screw
is positioned to avoid interference with Wall Connector cables.
INSTALLATION
24Gen 3 Wall Connector Manual