Owner's Manual

Table Of Contents
94 APPENDIX - Reference Information
Error Possible Causes
operations
A calculation tried to use more than 8 pending
operations.
Error 4
Out of range
Amortization worksheet: the value entered for
P1 or
P2 is outside the range 1-9,999.
TVM worksheet: the P/Y or C/Y value 0.
Cash Flow worksheet: the F
nn
value is outside the
range 0.5-9,999.
Bond worksheet: the RV, CPN, or PRI value _0.
Date worksheet: the computed date is outside the
range January 1, 1980 through December 31,
2079.
Depreciation worksheet: the value entered for:
declining balance percent 0;
LIF 0;YR_ 0; CST <
0; SAL < 0; orM011 M01 13.
Interest Conversion worksheet: the C/Y value 0.
The DEC value is outside the range 0-9.
Error 5
No solution
exists
TVM worksheet: the calculator computed
I/Y when
FV, (N Q PMT), and PV all have the same sign.
(Make sure cash inflows are positive and outflows
are negative.)
TVM, Cash Flow, and Bond worksheets: the LN
(logarithm) input is not > 0 during calculations.
Cash Flow worksheet: the calculator computed IRR
without at least one sign change in the cash-flow
list.
Error 6
Invalid date
Bond and Date worksheets: a date is invalid (for
example, January 32) or in the wrong format (for
example,
MM.DDYYYY
instead of
MM.DDYY
.
Bond worksheet: the calculator attempted a
calculation with a redemption date earlier than or
the same as the settlement date.
Error 7
TVM worksheet: the calculator computed I/Y for a