2 Test Summary
2.1 Definitions
This procedure details how to configure the HPA678 evaluation board. On the test procedure, the
following naming conventions are followed.
VXXX : External voltage supply name (VBUS, VBAT)
LOADW: External load name (LOADR, LOADI)
V(TPyyy): Voltage at internal test point (TPyyy). For example, V(TP1) means the voltage at TP1.
V(Jxx): Voltage at jack terminal (Jxx).
V(XXX): Voltage at (XXX). For example, V(VDPM) means the voltage at the test point which is
marked VDPM.
V(XXX, YYY): Voltage across point XXX and YYY.
I(JXX(YYY)): Current going out from the YYY terminal of jack XX.
Jxx(BBB): Terminal or pin BBB of jack xx
Jxx ON : Internal jumper Jxx terminals are shorted.
Jxx OFF: Internal jumper Jxx terminals are open.
Jxx (-YY-) ON: Internal jumper Jxx adjacent terminals marked as YY are shorted.
Measure:A,B Check specified parameters A, B. If measured values are not within specified limits, the
unit under test has failed.
Observe A,B Observe if A, B occur. If they do not occur, the unit under test has failed.
Assembly drawings have location for jumpers, test points, and individual components