User Manual

126 BA II PLUS™ Calculator
Error Possible Causes
Error 4
Out of range
In Amortization worksheet, attempted to enter a value for
P1
or
P2
that is outside the range 1-9,999.
In TVM worksheet, attempted to enter a value for
P/Y
or
C/Y
that is
0.
In Cash Flow worksheet, attempted to enter a value for
F
nn
(frequency) that is outside the range 11-9,999.
In Bond worksheet, attempted to enter a value for
RV
or
CPN
that is less than zero.
In Bond worksheet, attempted to enter a value for
PRI
0.
In Date worksheet, attempted to compute a date that is
outside the range January 1, 1950, through December 31,
2049.
In Depreciation worksheet, attempted to enter a value for
declining balance percent
0, for
LIF
0, for
YR
0, for
CST
< 0, for
SAL
< 0, or for
M01
1
M01
13.
In Interest Conversion worksheet, attempted to enter a
value for
C/Y
0.
After pressing
&
|
, attempted to enter a value for
DEC
that is outside the range 0-9.
Error 5
No solution exists
In TVM worksheet, attempted to compute
I/Y
when
FV
, (
N
Q
PMT
), and
PV
all have the same sign. Make sure that
cash inflows are positive and cash outflows are negative.
In TVM, Cash Flow, and Bond worksheets, input to
LN
(logarithm) is not > 0 during worksheet calculations.
In Cash Flow worksheet, attempted to compute
IRR
without at least one sign change in the cash-flow list.
Error 6
Invalid date
In Bond or Date worksheets, attempted to enter an invalid
date; for example, January 32nd.
In Bond or Date worksheets, attempted to enter a date in
MM.DDYYYY (U.S.) or DD.MMYYYY (European) format.
Dates must be entered in MM.DDYY or DD.MMYY format.
In Bond worksheet, attempted a calculation when the
redemption date is earlier than or the same as the
settlement date.
Error 7
Iteration limit
exceeded
In TVM worksheet, attempted to compute
I/Y
for a very
complex problem involving many iterations.
In Cash Flow worksheet, attempted to compute
IRR
for a
complex problem with multiple sign changes.
In Bond worksheet, attempted to compute
YLD
for a very
complex problem.