User Manual
Table Of Contents
- Important Information
- Overview of Calculator Operations
- Turning On the Calculator
- Turning Off the Calculator
- Selecting 2nd Functions
- Reading the Display
- Setting Calculator Formats
- Resetting the Calculator
- Clearing Calculator Entries and Memories
- Correcting Entry Errors
- Math Operations
- Memory Operations
- Calculations Using Constants
- Last Answer Feature
- Using Worksheets: Tools for Financial Solutions
- Time-Value-of-Money and Amortization Worksheets
- TVM and Amortization Worksheet Variables
- Using the TVM and Amortization Variables
- Resetting the TVM and Amortization Worksheet Variables
- Clearing the Unused Variable
- Entering Positive and Negative Values for Outflows and Inflows
- Entering Values for I/Y, P/Y, and C/Y
- Specifying Payments Due With Annuities
- Updating P1 and P2
- Different Values for BAL and FV
- Entering, Recalling, and Computing TVM Values
- Using [xP/Y] to Calculate a Value for N
- Entering Cash Inflows and Outflows
- Generating an Amortization Schedule
- Example: Computing Basic Loan Interest
- Examples: Computing Basic Loan Payments
- Examples: Computing Value in Savings
- Example: Computing Present Value in Annuities
- Example: Computing Perpetual Annuities
- Example: Computing Present Value of Variable Cash Flows
- Example: Computing Present Value of a Lease With Residual Value
- Example: Computing Other Monthly Payments
- Example: Saving With Monthly Deposits
- Example: Computing Amount to Borrow and Down Payment
- Example: Computing Regular Deposits for a Specified Future Amount
- Example: Computing Payments and Generating an Amortization Schedule
- Example: Computing Payment, Interest, and Loan Balance After a Specified Payment
- TVM and Amortization Worksheet Variables
- Cash Flow Worksheet
- Bond Worksheet
- Depreciation Worksheet
- Statistics Worksheet
- Other Worksheets
- APPENDIX - Reference Information
![](/manual/texas-instruments/iibapro-tbl-1l1/user-manual-english/images/img-57.png)
Bond Worksheet 53
• The calculator assumes that the redemption date (RDT) coincides with
a coupon date:
•To compute to maturity, enter the maturity date for
RDT.
•To compute to call, enter the call date for
RDT.
Entering CPN
CPN represents the annual coupon rate as a percentage of the bond par
value rather than the dollar amount of the coupon payment.
Entering RV
The redemption value (RV) is a percentage of the bond par value:
•For to maturity analysis, enter 100 for
RV.
•For to call analysis, enter the call price for
RV.
Setting the Day-Count Method
1. To display the day-count method, press # until ACT or 360 appears.
2. To change the day-count method, press &V.
Setting the Coupon Frequency
1. To display the coupon frequency, press # until 1/Y or 2/Y appears.
2. To change the coupon frequency, press &V.