Installation Guide

The Energy Guardian®
Pulldown Ladder Cover
Installation Instructions
For Support, Please Contact ESS Energy Products at: info@essnrg.com or 1-877-377-4674
7. ADHESIVE
The Energy Guardian® Speed ADHESIVE is essential for
bonding components together. If ADHESIVE is included,
cut a small corner off the bottom of the pouch and apply
where needed. Apply in a thin bead or in a spot the size of a
nickel for maximum adhesion. Set time is approximately 20
minutes. Keep at room temperature prior to use (70°F is ide-
al). ADHESIVE may be also sold separately.
1. LID
Note: Your kit will have either a ONE PIECE LID or a TWO PIECE LID
3. SHORT FRAME SECTION
(x2)
5. HANDLE
(x3)
4. L-BRACKET (x2)
&
SCREWS (x4)
6. PIN (x6)
Cut small corner off
pouch to create this
COMPONENT LIST:
Please check that all components are included and not damaged by shipping. If you have missing or damaged
components, STOP and call Customer Service at 1-877-377-4674 before returning the kit.
2. LONG FRAME SECTIONS
Note: Your kit will have either ONE PIECE or TWO PIECE LONG FRAME SECTIONS

Summary of content (4 pages)