Installation Instructions

Installation
Install the Counterweight onto
the Hand Spray Hose as shown.
Hand Spray
Hose
Counterweight
Hot
Supply
Hose
Cold
Supply
Hose
Hand Spray
Hose
Hand Sp
Check Valve
Housing
ray
Supply Hose
Connect the Hand Spray Hose
to the Hand Spray Supply Hose
on which the Check Valve housing
is fitted.
4
5
6
3
1”
Before connecting the hot and
cold Supply Hoses, flush water
supply stops to clear any debris.
Place a bucket underneath the
stops and run water for 5 to 10
Carefully position hot and cold
supplies so they will not interfere
with other hoses.
Connect the 3/8" Compression
Connections (Hot and Cold Supply
Hoses) to your hot and cold inlets.
Hoses are marked hot and cold.
1.
2.
3.
Important:
Remove protective paper and stick
rubber strips inside counterweight
Note
- make sure Hand Spray
Hose and Counterweight are free to
slide up and down and are not
in conflict with any plumbing
components or items under the sink
or Workstation.