Installation Instructions What is included in The RAQ Solar Mounting Kits? SR-3000 Includes Self squaring 3 Panel Rails with adjustable panel clamps, adjustable anchor bases, flashing and all hardware to assemble What will I need to Install The RAQ Solar Mounting Kits? SR-1000 Includes Self squaring 1 Panel Rail, with adjustable panel clamps, adjustable anchor bases, flashing and all hardware to assemble Safety Equipment: SR-0700 Start Bracket Kit Ladders, eye protection , hard hats and all fall prote
6 5 Open the assembly until bi-fold center brace (s) is straight, ensure holes are lined up for securing 7 Place T23 Bolt into predrilled hole by bi-fold hinge ensuring it is lined up with the predrilled hole below and tighten. 8 Locate all squaring arms; connected to the underside of cross brace, rotate them out to the point where they naturally land on the top of rail.
12 11 Before we secure rail (s) into roof we must be aware of a few things. First, anchor bases will always point up to the peak of the roof. Secondly, placement of preinstalled anchor bases may need to be relocated (depending on rafter spacing on roof being installed onto and wind and snow load capacities) . Preassembled anchor base spacing is set for 24” on center. Now is the time to configure rafter spacing for proper installation of anchor bases onto rail to be lined up with the rafter spacing.
17 Once the rafter location is determined based on your installation layout configuration predrilled holes should be made with the 4 1/2” drill bit in the location where anchor bases will be installed into roof rafters. Note: Anchor bases may need additional adjustments off the rail before they line up with rafters. Start from the top work your way to the right, then below.
23 Starting from the top row, from left to right, place the #1 PV module in the portrait position and place the module onto the 1st RAQ unit (under panel clamps on start brackets ) and hold up on right side to attach PV to inverter cables. 25 Before securing the next set of panel clamps onto 1st PV bring in PV module # 2 onto the next RAQ unit to the right. Install just like #1; by setting and tilting left side of PV in portrait position under panel clamps, attach PV to inverter and set down.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions COMPANY PROFILE 1. INTRODUCTION 1.1 Prefix 1.2 Grid‐tied PV System 1.3 How to Use This Manual 1.4 Label 2. SAFETY INSTRUCTION 3. FCC COMPLIANCE 4.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions COMPANY PROFILE Northern Electric & Power Inc. (NEP) was founded in the United States and has manufacturing and R&D facilities in China. The mission of the company is to develop cutting‐edge clean energy technologies and provide state‐of‐the‐art solar inverter products to its customers.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions 1.4 Label The label is located on the side of the inverter. The information on the label includes technical data as well as type, firmware version and serial number of the device. Safety instructions on the label are listed and explained below: 2. SAFETY INSTRUCTION WARNING: PLEASE READ THIS MANUAL BEFORE INSTALLATION.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions ● Increase the separation between the equipment and the receiver. ● Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. ● Consult the dealer or an experienced radio/TV technician for help. Changes or modifications not expressly approved by the party responsible for compliance may void the user’s authority to operate the equipment.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions Installing the BDM‐250 Micro inverter System involves several key steps: 1. Measuring service and installing the AC branch circuit junction box. WARNING: ONLY USE ELECTRICAL SYSTEM COMPONENTS APPROVED FOR WET LOCATIONS. 2. Attaching the BDM‐250 Micro inverter to the racking. 3. Connecting the BDM‐250 Micro inverter wiring harnesses. 4. Grounding the system. 5.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions 4. Connect the open wire end of the AC interconnect cable into the junction box using an appropriate gland or strain relief fitting. The AC interconnect cable requires a strain relief connector with an opening of 3/8 inches in diameter. Step 2 - Attach the BDM-250 to the Racking 1. Mark the approximate centers of each PV module on the racking system.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions Step 3 - Connect the BDM-250 Wiring Harnesses Each BDM‐250 comes with one 3‐pin bulkhead receptacle (or short pigtail) and one 70‐inch AC wire harness with multi‐pin connectors. (The DC input wires are approximately six inches long and are terminated with single pole connectors.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions Step 4 – Ground the System Each BDM‐250 comes with a ground clip that can accommodate a 6‐8 AWG conductor. If you are not using grounding washers to ground the BDM‐250 chassis as described in step2, route a continuous GEC through each of the BDM‐250 to the NEC approved AC grounding electrode. The racking and module could be grounded to this conductor using a crimp connection.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions Step 5 – Complete the connection map and connect the PV Modules BDM‐250 connection Map is a diagrammatic representation of the physical location of each BDM‐250 in your PV installation. The virtual array in NEP micro inverter gateway BDG‐256 is created from the map you create. Complete the connection map Each BDM‐250 has a removable serial number located on the individual label.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions 5. COMMISSIONING WARNING: CONNECT BDM‐250 TO THE ELECTRICAL UTILITY GRID ONLY AFTER RECEIVING PRIOR APPROVAL FROM THE UTILITY COMPANY. WARNING: BE AWARE THAT ONLY QUALIFIED PERSONNEL CAN CONNECT BDM‐250 TO THE ELECTRICAL UTILITY GRID. WARNING: ENSURE THAT ALL AC AND DC WIRING IS CORRECT. ENSURE THAT NONE OF THE AC AND DC WIRES IS PINCHED OR DAMAGED.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions 6. OPERATING INSTRUCTIONS The BDM‐250 is powered on when sufficient DC voltage from the module is applied. The status LED will start flashing after sufficient DC power is applied as an indication that the BDM‐250 is live. Status: standby The LED light is on by 2 second, and off by 2 seconds. Status: producing power The LED light is on by 1 second, and off by 1 second.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions Status: producing power and communicating with BDG-256 The LED light is on by 0.5 second, and off by 0.5 second. In case of fault, BDM‐250 has multiple protective functions and stops output power. The fault message may be sent to a connected BDG‐256 gateway through power line communication. The error message is displayed on the screen of BDG‐256 gateway by a 16‐bit error code. 7.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions Troubleshooting an inoperable BDM-250 To troubleshoot an inoperable BDM‐250, follow the steps in the order shown: 1. Check the connection to the utility grid. Verify that the utility voltage and frequency are within allowable ranges shown in the label of BDM‐250. 2. Verify utility power is present at the inverter in question by removing AC, then DC power.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions Installing a replacement BDM-250 1. Attach the replacement BDM‐250 to the PV module racking using hardware recommended by your module racking vendor. If you are using grounding washers (e.g., WEEB) to ground the chassis of the BDM‐250, the old grounding washer should be discarded, and a new grounding washer must be used when installing the replacement BDM‐250.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions 8. SPECIFICATION MODEL BDM-250-208A INPUT(DC) BDM-250-240 Max Recommended PV Power (Wp) 285 Max DC Open Circuit Voltage (Vdc) 60 Max DC Input Current (Adc) 12 MPPT Tracking Accuracy >99.
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions FUNCTIONS Reverse DC Polarity Protection Yes Overload Protection Yes NEMA‐6 Protection Degree Environment Temperature Environment Humidity OTHER PARAMETERS ‐40℃——+65℃ 100%, condensation Display LED LIGHT Communications Power Line Dimension (D‐W‐H mm) 230*138*35 2 Weight (Kg) 4 INPUT(DC) OUTPUT(AC) SYSTEM EFFICIENCY MODEL Max Recommended PV Power (Wp) Vmax PV (absolu
SP-1000 The Solar PaQ Solar Panel + Inverter + Universal Roof Mount Racking UPC: 861150002609 Microinverter Instructions PROTECTION FUNCTIONS OTHER PARAMETERS Anti‐Islanding Protection Over Current Protection Reverse DC Polarity Protection Overload Protection Protective Class IP Rating per Part 1 Environment Temperature Environment Category Wet Location Pollution Degree Environment Humidity Maximum Altitude Overvoltage Category Display Communications Dimension (D‐W‐H mm) Weight(Kg) Product Safety Compl
SP-1000 The Solar PaQ Trina ALLMAX M Plus 60 Cell 295 watt UPC: 861150002609 PANEL INSTALLATION MANUAL 1. DISCLAIMER OF LIABILITY • The installation, handling and use of Trina Solar crystalline modules are beyond company control. Trina Solar does not assume any responsibility for loss, damage, injury or expense resulting from the improper installation, handling, use or maintenance.
SP-1000 The Solar PaQ Trina ALLMAX M Plus 60 Cell 295 watt UPC: 861150002609 • Do NOT walk on the modules. • Do NOT disconnect the modules under load to avoid arcs and electrical shocks. If needed cover the module surface with an opaque cover. • For modules under IEC investigation, under normal conditions, a solar photovoltaic module is likely to experience conditions that produce more current and/or voltage than reported at standard test conditions.
SP-1000 The Solar PaQ Trina ALLMAX M Plus 60 Cell 295 watt UPC: 861150002609 Module model TSM-xxxPD05 TSM-xxxPD05.05 TSM-xxxPD05.08 TSM-xxxPE05A TSM-xxxPE05A.08 TSM-xxxDD05A(II) TSM-xxxDD05A.05(II) TSM-xxxDD05A.08(II) TSM-xxxPD05.
SP-1000 The Solar PaQ Trina ALLMAX M Plus 60 Cell 295 watt UPC: 861150002609 • For cUL listed products only: • Fire class rating: C • The fire rating of the module is valid only when mounted in the manner specified in the mechanical mounting instructions. • The module is considered to be in compliance with UL1703 only when the module is mounted in the manner specified by the mounting instructions.
SP-1000 The Solar PaQ Trina ALLMAX M Plus 60 Cell 295 watt UPC: 861150002609 3.1 PRODUCT IDENTIFICATION Each individual module has a unique serial number laminated behind the glass and another permanently attached to the back back-sheet sheet of the module on the product sticker. Note all serial numbers in an installation for your future records. 4. ENVIRONMENTAL CONSIDERATIONS ONSIDERATIONS 4.
SP-1000 The Solar PaQ Trina ALLMAX M Plus 60 Cell 295 watt UPC: 861150002609 • When all solar modules (except for smart module) are mounted in the same plane and orientation then all can be expected to have similar performance throughout the day and can be connected together to the same inverter channel.
SP-1000 The Solar PaQ Trina ALLMAX M Plus 60 Cell 295 watt UPC: 861150002609 6.3 MODULE WIRING • All wiring should be performed, by qualified installers, in accordance with the local codes and regulations. • Modules can be connected in series to increase the operating voltage by plugging the positive plug of one module into the negative socket of the next. Before connecting modules always ensure that the contacts are corrosion free, clean and dry.
SP-1000 The Solar PaQ Trina ALLMAX M Plus 60 Cell 295 watt UPC: 861150002609 7. ELECTRICAL CONFIGURATION Photovoltaic (electric) systems operate automatically and require very little day day-to to-day supervision. The solar array generates DC electricity whenever light falls on it similarly the inverter automatically turns ON as soon as there is sufficient energy from the solar array to efficiently convert this into grid.
SP-1000 The Solar PaQ Trina ALLMAX M Plus 60 Cell 295 watt UPC: 861150002609 8. MAINTENANCE AND CARE • A well designed solar system requires minimal maintenance; however, system performance and reliability can be improved by taking some simple steps. • Maintenance should be carried out at least once a year by trained personnel, always wearing rubber gloves and boots with maximum working voltage n not lower than 1000V DC (For TSM-PE05A.**, PE05A.**, PE14A.**, not lower than 1500V DC).
SP-1000 The Solar PaQ Trina ALLMAX M Plus 60 Cell 295 watt UPC: 861150002609 • • • • • • • 9.