Instructions / Assembly
Next we must locate the roof raers. An industry stand-
ard way to locate roof raers is to ulize a hammer and
strike the roof while listening for sound dierences.
If the raer is missed when predrilling minor adjust-
ments can be made to properly locate the raer, these
small adjustments will be protected by the anchor foot
ashing to be installed later or you can use roong caulk
to seal the unused hole.
If combining RAQ’s into a row now is the me to inter-
connect the rails. (If you are only building a stand-
alone unit you may move on to next step) Connect to-
gether by sliding male end into female end of rails.
Tighten aached bolts completely with a driver and
1/2” socket. As many as 18 PV’s can be assembled in a
row before you must start a new row. (Only 1 start
bracket kit needed per row).
A second row requires there is proper spacing between
rows, (generally 27” when using the standard 60 cell
panel)
Keep in mind: The preposioned slot available on the rail
allows for up to 3” of adjustment of the anchor foot le
or right, to compensate for most of all adjustments due
to roof raer spacing. Placement of the bolt for securing
onto rail always goes in lower slot.
Keep in mind: The anchor bases also allow for vercal
adjusts to compensate for variances in roof levels,
while maintaining minimum height distance from roof
to the boom of the solar panel
Before we secure rail (s) into roof we must be aware of
a few things. First, anchor bases will always point up to
the peak of the roof. Secondly, placement of prein-
stalled anchor bases may need to be relocated
(depending on raer spacing on roof being installed
onto and wind and snow load capacies) . Preassem-
bled anchor base spacing is set for 24” on center.
Now is the me to congure raer spacing for proper
installaon of anchor bases onto rail to be lined up with
the raer spacing. Predrilled holes are placed along the
rail based upon, 16”, 24”, 32”, 48’, even 72” & 96” spans
are available. If raer spacing does not line up with the
preassembled holes available feel free to drill a hole (s)
using cold rolled drill bit . Keep in mind this reduces self-
leveling abilies so please ensure placement before hole is drilled.
11
12
13
14
15 16