Instructions / Assembly

Each RAQ comes with pre drilled locaons for the in-
verters which allows for a multude of spacing adjust-
ments for cord management. Simply install inverter
with the T23 bolt provided. This bolt can be moved to
any predrilled locaon in the main rail. Once place-
ment is established set bolt but do not ghten. Slide
the inverter under the bolt, then ghten the bolt to
hold the inverter in place, the inverter may be posi-
oned on either side of the rail . Connect inverter ca-
bles to inverters according to manufacture suggesons.
A zip e is also included for cable management to be run down inside of C
Channel.
Once the anchor foot has been properly bolted to
the roof raers water protecon or roof ashing
can be placed. Unlike the majority of other rack-
ing systems, The RAQ, uses a Mechanical method
of water proong, not a chemical protecon.
Leveling the racking for mulple units in a row usual-
ly requires the installer to view the array from the
ground to determine if it is level based on aesthecs.
Please use a tape measure, string line, and a discern-
ing pair of eyes to make certain the array looks good
from every angle.
Begin by inserng the ashing under the shingle line
above the anchor foot locaon. Connue to rotate
the ashing under the shingle line unl it is fully seat-
ed over the anchor foot. Once ashing is seated over
the anchor base bend the tabs to secure the ashing
around the anchor foot. If you have a second row
below be sure there is proper spacing between rows,
(generally 27” when using the standard 60 cell panel)
Once the raer locaon is determined based on your
installaon layout conguraon predrilled holes
should be made with the 4 1/2drill bit in the loca-
on where anchor bases will be installed into roof
raers. Note: Anchor bases may need addional ad-
justments o the rail before they line up with raers.
Start from the top work your way to the right, then
below. If you have a second row below be sure there
is proper spacing between rows, (generally 27” when
using the standard 60 cell panel)
To adjust leveling simply locate the anchor base that
need adjusng and modify anchor base ll it is ush
with the roof surface.
Note: Occasionally, one side of the installaon may be
more visible
Next prepare PV s to be installed on leveled racking
17