Instructions / Assembly

Once aached, set PV down and center. Keep in mind:
The start bracket panel clamps must be adjusted uni-
formly; they allow for 3” of variance, determined by in-
stallaon conguraon. Secure upper and lower panel
clamps on the le side ONLY. To secure the # 1 PV mod-
ule, use the ½socket on the top panel clamp, start by
securing the panel clamp on the start bracket side( le).
Then slide the panel clamps from the right side to the le
thus aligning the panel clamp over the frame of the mod-
ule. Only secure the panel clamps on the frame of PV
module.
Starng from the top row, from le to right, place the
#1 PV module in the portrait posion and place the
module onto the 1st RAQ unit (under panel clamps on
start brackets ) and hold up on right side to aach PV
to inverter cables.
Leveling the solar array for mulple units in a row re-
quires the installer to view the array from the ground to
determine if it is level; based on aesthecs. Visual exami-
naon aer PVs installed adjustments made based on
installers eye to judge what anchors need to be adjusted.
Occasionally, one side of the array may be more visible
from the ground or even from a second-story window.
Connue using tape measure, string line, and a discern-
ing pair of eyes to make certain the array
looks good from every angle.
Before securing the next set of panel clamps onto 1st
PV bring in PV module # 2 onto the next RAQ unit to
the right. Install just like #1; by seng and lng le
side of PV in portrait posion under panel clamps,
aach PV to inverter and set down. Before securing #
2 PV to RAQ be sure it is ush and level with #1 PV.
Then secure the 1 & 2 PV module by securing the next
set of panel clamps upper rst, then lower clamp on
panel. Repeat for up to 18 panels before needing to