Operating Guide

5
INSTALLATION CHECKLIST
Share this checklist with your professional installer
Manifold Pressure and Nominal Inlet Pressure for appropriate gas type
o Using Natural Gas:
Minimum Inlet Pressure (W.C): 6”
Manifold Pressure (W.C.): 5.2
Nominal Input Pressure (W.C.): 7”
o Using Propane Gas:
Minimum Inlet Pressure (W.C): 8”
Manifold Pressure (W.C.): 6”
Nominal Input Pressure (W.C.): 11”
Clearances
o 5” minimum from bottom of heater to Top Surface of Floor
o 16” Minimum from sides to of Heater
o 42” Minimum clearance from top surface of heater and up
Connected to gas supply using a 3/8
th
inch UNF inlet connection to a ½ inch gas pipe
Unit is placed in a room that is a minimum of 1,150 square feet.
D battery installed & AA batteries placed in remote.
Adequate ventilation and fresh-air flow is appropriate for heater location
The Air Shutter is pre-set for Liquid Propane use. If using Natural Gas, see Air Shutter section of
manual.
Unit successfully tested
o Installed by:
Company __________________________________________
Installer __________________________________________
Contact Info ________________________________________
Date ______________________________________________
Note to installer: Ensure that you are referencing the product manual for full details on each of the
installation steps, warnings and considerations. This list is to be used to confirm the steps as you move
through the installation. Please leave this sheet with the user.
*Do not attempt any modifications, repairs or replacements on this unit without first discussing with
Thermablaster Technical Support. Doing so will void the product’s warranty. Professional Installation is
required by all local and National codes.
Unit is not to be used as a central heating system