Installation Sheet
•  Carefully conceal in attic space any extra lengths of 
the cables or the water supply above the shower area. 
Align the Rain Head xture to the three couplings. 
Make sure that the Rain Head will t perfectly and 
ush with the ceiling. IF needed please adjust the 
studs and couplings to assure perfect t.  
•  After you conrmed that the three couplings will 
perfectly align and Rain Head will be ush with the 
nished ceiling material apply silicone around center 
groove on back of the xture. Push xture tight 
against ceiling. 
•  Use the three provided screws and secure them into 
the xture which will connect with the couplings. 
Tighten them carefully so you don’t cross thread them 
or you don’t damage the xture.  
•  Allow silicone to dry for 24 hours.
•  Make sure that the M12 power/data cable is  
connected from the Rain Head to PDM 
•  PDM must be plugged in to standard 110V 
electrical outlet 
•  If your control is plugged in and powered ON 
you can test the lights and etc.
AUDIO CABLE
PDM Provided and ships
with ThermaTouch control
M12 Power/
Data Cable
Silicone Bead
all around the 
perimeter of groove.
Push xture tight 
against the ceiling.
Securing Serenity Rain Head
7
Connecting to Power Distribution Module (PDM)
8
Total Wellness Package
17
THERMASOL.COM 
I
 800.776.0711










