Electric Boilers BTH ULTRA Models ranging from 12 kW to 36 kW 208/240 Volts (1 phase) INSTALLATION & OPERATION MANUAL Your BTH ULTRA Electric Boiler has been carefully assembled and factory tested to provide years of trouble-free service. The following information and safety measures are provided to enable proper installation, operation, and maintenance of this product. It is imperative that all persons who are expected to install, operate or adjust this boiler should read these instructions carefully.
Table des matières Section 1: Technical specifications ............................................................................................................... 4 Table 1: Technical data on boilers operating at 240 Vac /1ph1 : .................................................................. 4 Table 2 : Boiler connections and dimensions (12-24 KW) ............................................................................ 5 Table 3 : Boiler connections and dimensions (27-36 KW) .....................
Section 6 MAINTENANCE .......................................................................................................................... 23 6.1 INTRODUCTION .............................................................................................................................. 23 6.2 AT ALL TIMES .................................................................................................................................. 23 6.3 TWICE A YEAR .................................................
Section 1: Technical specifications Table 1: Technical data on boilers operating at 240 Vac /1ph1 : Suggested size at 240V/1ph.3 BTH ULTRA Capacity (KW) Amps2 12 208V 9,0 240V 12 208V 43.5 240V 50 15 11.2 15 54.3 62.5 18 20 24 13.5 15 18 18 20 24 65.2 72.5 87 27 20.2 27 29 21.7 33 36 Heating Elements (240 V) Stages Cable Breaker (Amp.) Cu Al 4 6 4 70 4 6 4 80 75 83.3 100 4 x 3 KW 2 x 3 KW + 2 x 4.5 KW 4 x 4.5 KW 4 x 5 KW 4 x 6 KW 4 4 4 97.9 112.5 6 x 4.
Table 2 : Boiler connections and dimensions (12-24 KW) Connections Inlet (return) Outlet (supply) Safety valve Draining valve Shipping weight 1 “ NPT Fem 1 “ NPT Fem 1“reduced to 3/4 “ NPT Fem 1“reduced to 3/4 “ NPT Fem 63 lbs Item Dimension (inches) A B C D E F G H I J 21-1/2 9 11-3/4 3-5/8 2-3/8 14-3/4 5 9-3/4 20 1-1/2 Figure 1 : Boiler dimensions (12-24 KW) Table 3 : Boiler connections and dimensions (27-36 KW) Connections Inlet (return) 1 ¼ “ NPT Fem Outlet (supply) 1 ¼ “ NPT Fem Pressure relief
! General Safety Precautions Be sure to read and understand the entire Installation & operation manual before attempting to install or to operate this water heater. Pay particular attention to the following General Safety Precautions. Failure to follow these warnings could cause property damage, bodily injury or death.
Section 3: INSTALLATION The manufacturer’s warranty does not cover any damage or defect caused by installation, or attachment, or use of any special attachment other than those authorized by the manufacturer into, onto, or in conjunction with the water heater. The use of such unauthorized devices may shorten the life of the boiler and may endanger life and property. The manufacturer disclaims any responsibility for such loss or injury resulting from the use of such unauthorized devices 3.
3.4 PIPING INSTALLATION The inlet and outlet piping of the boiler must be in conformity with the different configurations shown below. Make sure that the fluid flows is in the proper direction. Figure 3 : Mounting positions 3.4.1 Type of installation You will find below on figures 4 to 8 the typical piping arrangement for the two main types of installation. The first being as a self-operating unit and the others being connected to an auxiliary boiler in dualenergy.
Figure 5 : Typical installation on fin-tube baseboards with zoning valves Figure 6 : Multi-pump zoning BTH ULTRA Electric Boilers Installation & Operation manual (Revision: June 2015) 9
Figure 7 : Typical Installation in Dual-Energy Series Figure 8 : Typical installation with three way valve BTH ULTRA Electric Boilers Installation & Operation manual (Revision: June 2015) 10
3.4.2 Boiler piping connection Make sure you connect the accessories and the piping to the proper connection fittings as indicated at figure 2 above and according to the selected mounting position. The outlet and inlet boiler connections are located on each sides. They consist of 4 steel couplings (1”NPTF on 12 to 24kW models and 1-1/4”NPTF on 27 to 36kW) where the piping connection will be made. Local codes may dictate the type of pipe to be used for the connections.
3.4.10 Dual Energy piping Piping connections between the two boilers can be made in parallel or in series as illustrated in fig. 7&8. When installed in parallel, a three way motorized valve (1”NPTF) is used to guide the heating system return water toward the auxiliary boiler or the BTH ULTRA electric boiler according to the operating mode in demand. This way, the oil or gas boiler is not maintained hot by the return water when the operation is in Electricity. N.B.
Both circuits will need to be protected with appropriate breakers or fuse (see table below giving the amperage drawn by the boiler on each breaker) in conformity with local electrical codes. Connections are made directly on the two breakers inside the boiler. These breakers can receive copper or aluminum cable up to #1AWG..
Zoning applications with motorized valves Connect the end switch contact of all motorized valve to terminals R & W on the boiler. Connect the circulator to terminals “P” and “P”- in the boiler. The connection of the thermostats to their corresponding zone valve shall be done according to the zone valve manufacturer’s instructions. See on fig.5 below a typical example. The R & C terminals on the boiler can be used to supply 24Vac to the zone valves if the corresponding load does not exceed 15VA.
Diagramme électrique/ Wiring diagram 208-240V/1ph L2 Noir/blk G R1 Élément chauffant/ Heating element F-5A Blanc/white EL1 C1-4 C1-2 Légende/ Legend N Haute limite à ré-enclenchement manuel High limit « manual reset » HL-MR Noir/blk Noir/blk Rouge/Red BTH ULTRA (240V/1ph-12 @ 24kW) BTH ULTRA (208V/1ph-9 @ 18kW) L1 R2 EL2 Haute limite à ré-enclenchement automatique High limit « automatic reset » HL-AR G R3 40VA EL3 Bleu C1-3 C1-1 208 or 240V R4 EL4 Contrôleur/Control ULTRA SMART
Section 4: ADJUSTMENT OF THE CONTROLLER 4.1 INTRODUCTION 4.
4.3 OPERATION OF THE INTERFACE The controller uses four push buttons at the bottom of the display to select and adjust the parameters. The button is used to access the configuration menu and confirm a selection. The buttons are used to select an item or adjust a value. The button enables the illumination of the display under two different modes. The default mode will enable the illumination of the display for a period of 10 sec. each time a button is pressed.
The following tables show the values of the target temperature that will be obtained in relation to the outdoor temperature. PLINTHES CHAUFFANTES À AILLETTES FINNED-TUBE HOT WATER BASEBOARDS 190F/88C MAX STD 170F/77C MIN 160F/71C 150F/65C 140F/60C 130F/54C 120F/49C 80F 27C 70F 21C 60F 15C 50F 10C 40F 4C 30F 0C 20F -7C 10F -12C 0F -17C -10F -23C Temp. de consigne / Target temp. 180F/82C 110F/43C -20F -29C Température ext.
This being done, the installer will have to access the configuration menu by pressing the button for 2 sec. until the first menu appears. The selection of the item or value is made by pressing the button and by pressing the button to get to the next menu. See table 1 below to visualize the menu list that will gradually be displayed. If the buttons remain untouched for a period of 10 sec., the controller will register the value of the selection made and return to the regular display position.
Select the outdoor temperature at which no heating of the building is required (the outdoor sensor has to be installed) 0°F à 105°F 75°F Note 1: Once the operating parameters have been set, the controller will automatically come back to normal display screen. If the user needs to increase or decrease the target temperature, he can do it without having to enter in the configuration menu (see the following section). the selected item and will return to normal operation after 5 sec.
the + button or by re-setting the operating parameters using the tool menus . The Boost menu can be cancelled by selecting “OFF” in the Boost menu. 4.11 OPERATION IN DUAL-ENERGY: In Dual-energy mode, the display will indicate that this mode is active in showing the icon If it is not shown, check the position of the switch located at the back of the controller. It must be set to “Bi-Energ” position. N.B. The controller will have to be reset to register the new mode of operation.
Section 5: START UP OPERATION SAFETY PRECAUTIONS ! Before operating this boiler, be sure to read and follow these instructions, as well as the warnings printed in this manual. Failure to do so can result in unsafe operation of the boiler resulting in property damage, bodily injury, or death. Should you have any problems reading, following or difficulty in understanding the instructions in this manual, STOP, and get help from a qualified person. Do not turn on the boiler unless it is filled with water.
Section 6 MAINTENANCE 6.1 INTRODUCTION Properly maintained, your boiler will provide years of dependable, trouble free service. It is recommended that a regular routine maintenance program be established and followed by the user. Components are subject to eventual failure that requires service. Failure to use the correct procedures or parts in these circumstances may make the unit unsafe or reduce the life of the boiler.
Section 7- TROUBLE SHOOTING 7.1 TROUBLE SHOOTING TABLE PROBLEM The display shows --- in “TARGET TEMP” The display shows “Er1” and the icon CAUSES -There is no heating demand when the outdoor sensor is used and the icon is shown, the outside temperature is above the boiler shut down setting. -The switch located on the back of the controller is set to “BiEnerg” and the icon is shown. The controller is not detecting the presence of the outdoor sensor. is displayed.
Boiler stays in demand even when the thermostat is not in demand. (Systems with more than one thermostat) An overheated plastic odour is released from the boiler Boiler safety valve is leaking defective -The total capacity of the boiler is expelled to the heating distribution system at this temperature. -On systems with electric zone valves, one or many end switches included in the valve is defective. -A jumper has been installed on terminals TT of the boiler Turn the power OFF to the boiler.
7.2 SPARE PARTS Temp.&Pressure indicator ZMC300-75P160CN Pressure relief valve ZMC200-SV30PSI1 Transformer 208/240V x 24Vac ZEL400- 20842440 (40VA) Power relay 24Vac ZEL100-24ACNO30 Fuse ZEL250-TDMIDJ5 UltraSmart Controller ZEL100-ULTRA 4 poles Contactor 24Vac ZEL100-4P50A24 Figure 18 : Spare parts (front, 12-24 KW) Surface High-Limit manual reset switch (on some Models) ZEL200-DISC227 Heating elements** 3kW : ZEL300-240V3KW 4.
Temperature and Pressure Indicator ZMC300-75P160CN Pressure relief valve ZMC200-SV30PSI1 Transformer 208/240V x 24Vac ZEL400-20842450 (50VA) Fuse ZEL250-TDMIDJ5 Power relay 24Vac ZEL100-24ACNO30 UltraSmart Controller ZEL100-ULTRA 4 poles Contactor 24Vac ZEL100-4P50A24 Figure 20 : Spare parts (front, 27-29 KW) Heating elements** 3kW : ZEL300-240V3KW 4.
Temperature and Pressure Indicator ZMC300-75P160CN Pressure relief valve ZMC200-SV30PSI1 Transformer 208/240V x 24Vac ZEL400-20842450 (50VA) Power relay 24Vac ZEL100-24ACNO30 Fuse ZEL250-TDMIDJ5 UltraSmart Controller ZEL100-ULTRA 4 poles Contactor 24Vac ZEL100-4P50A24 Breaker ZEL900-2P100A Figure 22 : Spare parts (front, 33-36 KW) BTH ULTRA Electric Boilers Installation & Operation manual (Revision: June 2015) 28.
BTH ULTRA LIMITED WARRANTY Warranty Coverage on the tank. Thermo 2000 Inc. hereby warrants that the BTH ULTRA tank on normal use and service will not leak for a period of fifteen (15) years from the date of purchase. The warranty is valid as long as the original residential purchaser owns the building in which the unit was originally installed.