Operating Manual
Accu-Wave Appendix C Menu Flowcharts  
TN Technologies C-3 
“Set Up Level, Level Alarms, & Volume” Menu Group 
“Set Up Level, Level Alarms, & Volume” Menu 
Display  Comments 
(primary measurement 
setup items) 
Page 3-2. Set up the primary measurement. 
(current output span / 
display scaling)  
Page 3-2. Set up the current output span relative to 
the primmary measurement. Only displayed if I/O 
board w/current output is installed. 
Set up alarm 1  
 (alarm 2,etc)→→ 
Page 3-6. Set up alarm(s) for primary measurement. 
Only displayed if relays are installed or if alarm-
related selections are enabled in “Special functions” 
menu. Menus displayed for alarms 2–16, as needed. 
Tank volume setup→→ 
Page 3-13. Set up volume measurement (optional). 
“Set Up Additional Measurements” Menu Group 
“Set Up Additional Measurements” Menu 
Display  Comments 
Modify setup of 
measurement 1 
(units) →→ 
Page 3-2. Modify setup of primary measurement. 
Only displayed if service-only items are enabled in 
the “Special functions” menu. 
Assign & setup or 
Modify setup of 
measurement (number) 
(units) →→ 
Page 4-1. Set up or modify previously setup 
additional measurements.  
(measurement type and 
units items) 
Page 4-2. Define parameters for next measurement to 
be set up (measurement number 2 to 8).  
(measurement display 
items) 
Page 4-6. Parameters related to measurement readout 
display. 
Set up alarm n →→ 
Page 4-9. Set up alarm(s) for additional 
measurements. Alarms must first be assigned to 
measurement (see page 6-3). 










