Operating Instructions and Installation Instructions

Pag.27
15. Positioning the ceramic wood blocks TRANSPARENTE 73-100-120-140-160 AB
(See pages 29, 30, 31, 32 and 33 )
Please note:
when installing the log inset and the various glowing materials and accessories, the following must
be taken into account:
* There should be no glowing material in or on the pilot burner.
* Arrange the log inset composition as shown. In other words the blocks will have to be positioned in exactly
the same way. An individual structure to ensure this will need to be used where required.
* Mix the glowing material (lava granules) and the “fusilli” (spiral-shaped ceramic material) and spread them
evenly over the burner and the burner plate so that they are just covered. Glowing embers can be placed here
and there as decoration.
NOTE: the remaining material can be discarded. If you place too much glowing material this can affect the
burning process.
* Then place the logs in the correct order as shown on pages 30 to 34
* Carefully position the log inset.
Different positions may have a significant influence on the flame image or cause poor functioning of the burning
process.
16. Positioning the Pebbleset - TRANSPARENTE 73-100-120-140-160 AB(See page 34)
* Scatter vermiculite evenly over the burner tray. Make sure the pilot light remains unobstructed.
* Place a row of medium-sized and large pebbles at the front of the burner plate
* Fill the burner tray with small and medium-sized pebbles from the front to the rear. Place the pebbles as
closely as possible to each other on the burner tray.
* Fill the rear of the burner plate with medium-sized and large pebbles.
* Replace the window, following the instructions for removing it in reverse order.
17. Positioning the Carrara stones - TRANSPARENTE 73-100-120-140-160 AB (See page 34)
* Scatter vermiculite evenly over the burner tray. Make sure the pilot light remains unobstructed.
* Fill the burner tray neatly and evenly with the Carrara stones.
* Replace the window, following the instructions for removing it in reverse order.
When the whole assembly is ready, you should perform a test-run ignition. Start the procedure as described in
the operating instructions.