Operation Manual

13
On completion of the installation a warning notice complying to EN721 Annex A should be
affixed adjacent to the appliance.
If other appliance/s are located below the hob we recommend conducting a temperature
verification test to confirm any rise in temperature of the cabinet materials are within allowable
limits and meet requirements specified in EN30-1-1, EN1949, EN1645-1, EN1646-1, EN1647,
EN721.
Gas Connection
Prior to connection ensure the local conditions for gas type and gas pressure match the
appliance specification. (Gas type and pressure for this appliance are printed on the databadge
located on the base of appliance)
The Ø8mm gas inlet is located to the rear of the appliance. Prior to connection remove the
plastic protection plug from the fitting. The appliance MUST be connected using metal pipe
manufactured from either copper, seam welded steel, seamless steel or stainless steel, which
complies to the requirements of EN1949, rubber tubing MUST NOT be used.
INSTALLATION
GB
Where Spark Ignition is fitted the appliance MUST be earthed
After Installation the appliance MUST be tested for soundness
The gas supply input pressure to which this appliance is connected,
MUST not rise or fall by more than 2.5 mbar (butane/propane) from
nominal when ALL appliances connected to the supply are OPERATED
simultaneously. If this appliance is not installed in accordance with the
instructions and tolerances detailed herein, we the manufacturer can not
be held responsible for any problems that occur, or poor performance
that is perceived/witnessed.