Cut Sheet

Wire Safe
®
Wireway and Wiring Trough
G-24
Wire Management Products
Clear Primer
STANDARD STD. STD.
CAT. NO.
SIZE CTN. WT. (LBS.)
VC9903 Pint Dauber Top 24 27.0 lbs.
VC9902 Quart Dauber Top 12 25.0 lbs.
Cement and primer not needed for end caps.
All Weather Quick-Set Clear Cement
STANDARD STD. STD.
CAT. NO.
SIZE CTN. WT. (LBS.)
VC9984 1/2 Pint Dauber Top 10 7.0 lbs.
VC9983 Pint Dauber Top 24 30.0 lbs.
VC9982 Quart Dauber Top 12 29.0 lbs.
VC9981P Gallon Pour Top 6 54.0 lbs.
Dimensions
OUTSIDE OUTSIDE INSIDE INSIDE INSIDE WIREWAY COVER WT./FT.
NOMINAL SIZE (IN.) ACTUAL SIZE (IN.) HEIGHT (IN.) WIDTH (IN.) AREA (IN.
2
) THICKNESS (IN.) THICKNESS (IN.) (LB./FT.)
2 x 2 1.97 x 1.97 1.8 1.79 3.31 0.09 .08 0.6
3 x 3 2.96 x 2.96 2.8 2.76 7.94 0.10 .08 0.85
4 x 4 3.94 x 3.94 3.75 3.72 14.39 0.11 .08 1.48
6 x 6 5.91 x 5.91 5.67 5.67 13.48 0.12 .12 2.29
All information represents typical values and does not represent a minimum performance specification.
Materials
PVC Homopolymer (ASTM F1784) minimum cell class 12354B
Specific Gravity (ASTM D792) 1.46
Thermal Conductivity (ASTM C177) 1.3 Btu/hr./ft.
2
/
°
F/in.
Heat-Deflection Temperature
@264 psi (ASTM D648) 70° C
Tensile Strength (ASTM D638) 6000 psi
Flammability (UL 94) V-O
Physical Properties
SIZE CRUSH STRENGTH
1
IMPACT STRENGTH
2
(IN.) (LBS.) (FT.-LBS.)
2 x 2 650 40
3 x 3 500 30
4 x 4 500 40
6 x 6 600 50
1 — Load on 6" long sample just prior to wall buckling; fully recoverable.
2 — Five lb. weight with 1
1
4" dia. face at 73° F.
1.
Make a square cut using a miter box or precisely marked line
on the wireway to provide a smooth connection.
2.
Make certain surfaces to be bonded are free of dirt, dust, etc.,
by wiping them clean with a rag and by removing sawcut burrs
with a knife or rasp.
3.
With a dauber, place a coating of Carlon
®
Clear Primer on the wireway
and its mating parts. Thoroughly coat the surfaces to be mated.
4.
Allow the Carlon
®
Clear Primer a few seconds to soften the PVC
surface (the time may need to be adjusted depending upon
the temperature).
5.
Apply a complete coating of Carlon
®
Quick-Set Clear Cement to
matching ends that will be joined.
6.
Hold the parts in position by exerting pressure on the surfaces
with clamps.
7.
Allow 15 minutes or more before removing clamps.
Cementing Instructions
Expansion And Contraction
Wireway will expand or contract with variations in temperature. To compensate for this expansion and contraction, during installation leave a 0.25" gap at joint,
glue only one side of internal coupling or use external coupling with push rivets. All mounting holes should be drilled oversize and fasteners should not be
tightened fully to allow for expansion and contraction.