User's Manual Part 1

Installation - 38 -
®
Affinity LBD-200C-N1 Transmitter
Product Manual
7.1.6 Installation of Front-End Power Supplies
The two 48V Front-End Power Supplies occupy 3RU of chassis rack space and are installed left
justified in the bay located above the Driver and Power Amplifier Segments. Each Front-End
Power Supply slides into the sub-chassis on nylon slides and connects to the Front-End Power
Supply Backplane via floating connectors.
Front-End Power Supply
Front-End Power Supply LED Indicators