Instructions / Assembly

Installation Introduction
17
5. When all connections have been made, make sure all range controls are in the
position and turn on main gas supply valve.
6. Leak testing of the appliance shall be conducted according to the manufacture’s
instructions. Use some soap water (50% water and 50% soap) or a leak detector at all
joints and connections to check for leaks in the system. Do not use a flame to check
for gas leaks.
7. The appliance must be isolated from the building’s gas supply piping system by
closing its individual manual shut-off valve during any pressure testing of the gas
supply piping system at test pressure equal to or less than
1
/
2
psig(3.5kPa).
After installation:
Check ignition of cooktop burners.
Check ignition of oven burner.
Visually check tubular burner (oven burner) re-ignition to be sure both rows of burner
ports are relighting each time.
Check for gas leaks at all gas connections( using a gas detector, never a flame).
Check oven bake and convection bake function.