User Manual
Table Of Contents
- Safety summary
- Antenna safety instructions
- About this manual
- Introduction to EXPLORER 540
- To get started
- Operation
- Configuration with web interface
- The web interface
- To control data connections from web interface
- To set up your data connection packages (BGAN M2M)
- Status information
- The Control panel
- To restart the installation process
- To use the logs
- Terminal settings
- Port forwarding
- To manage connected devices (Traffic control)
- To set up tracking
- Support features
- Advanced settings
- To enter the SIM PIN in the web interface
- Maintenance and troubleshooting
- Technical specifications
- Command reference
- BGAN non-M2M functions
- Conformity
- Glossary
- Index
Chapter 2: To get started
98-148232-B Fixed installation of the EXPLORER 540 10
2. Insert the positive wire into the terminal marked 1-DCIN+ in the DC terminal block and
tighten the screw.
3. Insert the negative wire into the terminal marked 2-DCIN- in the DC terminal block and
tighten the screw.
4. If the DC cable is shielded, insert the end of the shield into the terminal marked 3-GND in
the DC terminal block and tighten the screw.
5. Tighten the cable gland.
Fixed installation of the EXPLORER 540
To install the EXPLORER 540 in a fixed installation, use the pole mount kit included in the
delivery.
For details on how to install the EXPLORER 540, see the included installation guide.
To power the EXPLORER 540
The EXPLORER 540 has no power switch, but is automatically switched on when power is
applied to the DC input or the LAN interface.
Use one of the following power sources (connected at installation, see the Installation guide):
• PoE+ via the LAN interface
• 12 or 24 VDC nominal, e.g. from a battery (absolute maximum rating 10.5-32 VDC)
Important
Make sure all cables are connected and the Installation process for satellite
operation is completed before you fasten the EXPLORER 540 in your fixed
installation.