User Manual

Table Of Contents
Introduction
99-137719-D Confidential - For internal use 14-5
14141414
Type approval
14.1.5 Beta test
The purpose of the beta test is to validate the BGAN terminal in the target environment
by real customers in order to spot possible issues and obtain end-user feedback about
the product. The beta test will be performed by end-users identified by the BGAN
terminal vendor. Also, Inmarsat will typically be offered a system in order to make a
test and provide feedback. The scope of the specified beta test requires the end-user to
make some predefined tests. It will also enable the end user to gain experience with
the system.
The end users must fill out a beta test report documenting the executed tests and
providing feedback about the product performance. Upon completion of the beta test a
report must be generated and forwarded to Inmarsat.
The beta test campaign will typically consist of the following tasks:
In-house beta test dry-run
External beta test with selected customers
Possible test and feedback by Inmarsat
Beta test report reviewed and approved