User's Manual

41
Installation
0544
Semi-functional control unit
39654B
Drilling plan
100
100
36
226
80
120
min. 200
Space for handset
Space for cable and handset cable
78
70
41
54
100
50
28
100
16
50
access recommended
2xø4.5
25
detaching control unit
Space for installing and
2xø5
Length of spiral cord
at rest : 380 mm
9,6
83
Weight :
Semi-functional control unit 1.2 kg
Installing a single CU
After the CU is connected the unit can be operated straight away without any configuring.
Installation with 2 CUs
If an installation is carried out providing 2 new CUs, it is important when powering these up
for the first time, that this is done sequentially, to allow the CUs to acquire their individual
identity on the SPARC II bus:
2 newly installed CUs:
Power on VHF
Power on first CU
Power on second CU
If an additional CU is installed in a system already working with a single CU, the
already existing CU must be switched on prior to the first power-on of the new CU.
Adding a CU in an installation already providing one CU:
Power on VHF
Power on the existing CU
Power on the newly installed CU
This procedure is also followed if a CU is moved from another installation to this installation.
Always turn on the existing CU before turning on the last acquired one - when powering for
the first time after installation.