Color Logo use on white background only Owners Manual Red: 0-100-100-0 LH200 Blue: PMS 293 100-56-0-0 Platform Hoist Black Logo use on white background only • Lift Hoist 200 lb. Capacity • Quick Change Drum • Collapsible Carriage Updated 1/3/2012 Instructions #08100 TIE DOWN ENGINEERING • 255 Villanova Drive SW • Atlanta, GA 30336 www.tiedown.
Congratulations on your Purchase of the TranzSporter Lift Hoist. The TranzSporter Lift Hoist - Series was designed to last. Features include... • Collapsible Carriage Assembly • Unitized Design - Fewer parts, stronger, less maintenance • Non-Slip Carriage Deck - Safer operation • Heavy Duty Aluminum Track - Absorbs more punishment • Tethered Push Pin - Keeps deck in place when transporting or when operator is away from the hoist.
REPAIR INFORMATION Your Lift Hoist is designed to provide years of service, however, when your hoist requires parts, service or repairs, please contact your nearest authorized dealer, or call 1-800-241-1806, ext. 1525 for information on where to take your platform hoist.
Safety instructions CAUTION: Please read the safety warnings and Instructions contained in this manual before operating the lift hoist. Failure to obey the warnings contained herein could result in personal injury or damage to the equipment; however, this information should not be a substitute for routine accident prevention, but rather an addition to routine accident prevention. GENERAL SAFETY INSTRUCTIONS: 6. 7. 8. 9. 10. 11. 12. 13. 14. DO NOT REMOVE THIS TAG! 15642-2 3. 4. 5.
Assembly Instructions LH200 Congratulations on purchasing the TranzSporter LH200. The three boxes and bundles of tracks contain the assembled parts plus the owner’s manual, making up the LH200. Please read the following instructions completely before starting assembly. Refer to the owner’s manual for further information on use and maintenance of the LH-200.
4. The top cap is bolted to the end of the last section of track section you intend to use. Assemble as shown right using two 3/8” x 3/4” hex head bolts with lock nuts provided. 5. Attach slice plates to the bottom section of the track. Splice plates are mounted on the outside track section. Slide the top section track into the groves on the inside track section, attach with 2 nuts and bolts per side. Shown left. Picture 6 Picture 7 6.
8. Feed the V belt as shown in Picture 9 over the engine gear sheave. There should be enough slack so that it fits loosely. Picture 9 9. Slide the brake handle over the brake arm and tighten thumb screw provided. 10. Place the two collapsible platform support tubes into the slots near the bottom of the platform. Secure with push pins on both sides. Support Tubes Push Pin 11. If needed, attach the two plywood/rolled goods brackets with the push pins provided (Shown right).
GASOLINE POWER UNIT 1. 2. 3. 4. 5. 6. Handle fuel with care. It is EXTREMELY flammable and explosive under certain conditions. Do not smoke, allow open flames or sparks to be present during the refueling operation. Use only an approved fuel container to transport fuel. Do not fuel while engine is hot - allow to cool before attempting the refueling operation. Replace all fuel tank caps securely and wipe the spilled fuel before restarting engine.
3. When the hoist reaches a vertical position, carefully turn the hoist 180 degrees with the platform pointing away from the building. Move the bottom of the hoist away from the building, 1/4 of the height of the building where the top of the hoist is to be supported. Angle of track sections from building should be between 18 and 20 degrees. Make allowances for an overhang. See track section chart for approximate distances of the base from the building.
Track Section Chart - Brace Support Track lengths in excess of 28 feet require the use of the telescoping brace (#60005). The table below provides the suggested information for the distance of the bottom track from the building and the location of the track support for various conditions.
TranzSporter Accessories All Sold Separately Access Pack For use with solar panels and other building materials Additional Track Sections • 4’, 8‘ & 16’ for all models • Track sections supplied with splice plates and bolts For the Most Up to Date Information and Instructions, Visit the TranzSporter Web Site at www.tranzsporter.com For More Roofing Products Visit Our New Roof Zone Web Site: www.roofzone.com TIE DOWN ENGINEERING • 255 Villanova Drive SW • Atlanta, GA 30336 www.tiedown.
Operation of LH-200 & LH-2000 - Safety Instructions La operación de LH-200 & LH-2000 Instrucciones de Seguridad WARNING: • KEEP TRACK SECTION CLEAR OF ALL ELECTRICAL WIRES AND EQUIPMENT • BE AWARE OF OVERHEAD OBJECTS • NEVER USE HOIST AS A LADDER • NEVER OPERATE HOIST WITH A HUMAN ON PLATFORM • NEVER STAND UNDER PLATFORM WHEN LOWERING • NEVER USE GASOLINE MODELS INDOORS OR IN AN AREA WITH POOR VENTILATION ADVERTENCIA: • MANTENGA LA SECCION DEL VESTIGIO DESPEJADA DE TODOS ALAMBRES Y EL EQUIPO ELECTRICOS • C