Owner's Manual Parts list Instruction guide Warnings Please read carefully before assembling and using product.
Part # 1 2 3 4 5 6 7 8 9 10 11 12 13 Stock # 26605 26606 26607 26608 26609 26610 26611 26612 26613 44816 17057 MWS15L 17150 Description Qty.
1. Assembly of Carriage Step One Roller assemblies are installed in the top four holes of the Jet Rail Carriage. Hammer a palnut on one end of each of the four rods. Lay carriage upside down as shown in picture 1. In "bottom" four holes, slide the rods through one side of the carriage. Install 2 - 1/2" nylon washers, the 4" nylon bushing, 2 - short nylon bushings over the 4" bushing, 2 nylon washers, through the other side of the carriage, hammer palnut on end of rod. Repeat for the remaining three rods.
. Attach Front Deck Mount to Frame Tube 1 Attach front deck mount to front of frame tube (front of tube has a single hole on each side of the tube,Picture 6). Front deck mount is mounted flush against end of the frame tube using the U-bolt, metal washers and nyloc nuts as shown in Picture 5. # 4 1 26 33 37 Parts required for this step. Stk. # Description 26608 Front Deck Mount 26605 Jet Rail Frame Tube 10985 1/2" U-Bolt 10645 1/2" Nyloc Nut BBW500 1/2" Flat Washers Qty.
7. Attach Bunks to Jet Rail Deck Attach one swivel bracket on each "corner" of the Jet Rail Deck as shown in Picture 9. There are several holes in which to adjust the width of your bunk boards to fit your watercraft. We recommend that you start with the outer most hole and adjust inward if necessary. Tighten bolts enough to allow adjustment of the bunks on your watercraft. Attach bunk boards to the swivel brackets on each side of the deck, with two 1-1/4" screws at each bracket.
9. Assemble Bow Stop Picture 12 Attach 4 inch spool rollers to the bow stop using two hex head bolts, 5" x 1/2", two flat steel washers and two 1/2" nyloc nuts. The washers are used on top of the rollers. (Picture 12) Slide the bow stop over the upright winch mount tube, rubber rollers in the "up" position. Using the holes in the bow stop plate next to the winch mount tube,place a 4 inch x 3/8" bolt and nyloc nut. Tighten bolt so that the bow stop is about 12 inches below the top of the tube.
11. Assemble Winch Handle Attach the winch handle to the winch. Turn clockwise until handle turns gears. Place spring in handle shaft, followed by the nyloc nut supplied with the winch. Tighten nut. Pictures 15 12. Attach Winch Strap to Winch Using a three inch x 1/4" hex head bolt, washer & nyloc nut, attach the winch strap to the winch as shown in pictures 16 & 17. Wind the winch strap onto the winch using the winch handle. Pull length of strap down side of tube, through the bow stop.
Instructions for use. To load watercraft onto Jet Rail, slide deck back to rear of Jet Rail. Tilt deck into water. Jet Rail extends to the length of the watercraft. Use pin provided to lock winch tube in place before using lift. Also make sure the bow stop is tightened approximately at bow level. This may need to be adjusted to fit your watercraft. Pull enough strap out to reach watercraft. Hook to watercraft and turn winch handle to pull watercraft out of water. Winch until watercraft meets bow stop.
• One person launch n' load • Easy assembly • Nothing else to buy • Small "footprint", takes up less room on dock The Jet Rail is an all galvanized steel PWC lift designed for easy one person "launch and load". The small foot print under the ski allows easy walk around while the watercraft is stored on the dock or seawall. The 800 lb. brake winch and mount adjusts to any size watercraft and slides inside the lift when not in use, saving even more precious dock space.