User guide
4 - #12 x 1”
Tek Screws
4 - #12 x 1”
Tek Screws
Installation of Xi2 Ground Systems
1. Identifythenumberofsystemstobeusedontheunitusingthechartprovided(seepage4).
2. Identifythelocationwherethesystemswillbeinstalled.
3. Clearallorganicmatteranddebrisfromthepadsite.
4. PlaceU-boltsthroughholesinpanprovided.
5. Placepadcenteredunderbeamwiththelateralstrutbrackettowardstheinsideoftheunit.
6. Pressordrivepanintogrounduntillevelandushwithpreparedsurface.
7. BuildpieraccordingtoState,Localorunitmanufacturersguidelines(Figure1).
8. AttachtheendofthesmallertubetotheinsideofpanusingU-bolt&nutsprovided
9. AttachtheagendofthelargertubetotheoppositeI-beamusingthe“J”boltoverthetopoftheI-beam
withthenut&washerprovided(Figure2).
10. Installaminimumoffour(#12x1”tekscrews)self-tappingscrewsintotheholesprovidedinthelateralstrutso
thatthetwotubesshouldoverlapaminimumof6”.(Figure1).
Figure 1
Figure 2
4 - #12 x 1”
Tek Screws
11. InstallframebracketclampstoI-beamonin
sideofblock/pier.Donottightennutsatthistime.
12. AttachlongitudinalstruttoU-boltinpanusing
nutsprovided.
13. Insertstrutintheframebracketclamp,attachwith
nutandbolt.Donottightenatthistime.
14. Pulltheframebracketclampwiththefastened
strutoutwardtoremoveanyslack.
15. Tightenallnutsandboltsonthestrutsand
beamclamps.
Page2of4