User guide

Lateral
Longitudinal
Beam Clamp
Bracket
J-Bolt
Nut & Washer
1-1/2" Tube
Lateral Struts
1-3/4" Tube
4 - #12 x 1"
Tek Screws
I-Beam
Lateral
Longitudinal
Beam Clamp
Bracket
J-Bolt
Nut & Washer
1-1/2" Tube
Lateral Struts
1-3/4" Tube
4 - #12 x 1"
Tek Screws
I-Beam
Xi2InstallationPlacement
Beam Clamp
Bracket
J-Bolt
Nut & Washer
Figure 1
Single Section* - WZ I
0-80’Box 2Xi2Systems
Double Section - WZ I
0-80’Box 2Xi2Systems
Triple Section - WZ I
0-80’Box 2Xi2Systems
Xi2 Stabilization Pier Placement for Ground or Concrete
Up to 12’
Wall Height
Number of Xi2 Systems Required
14’
Wall Height
0-72’Box 2Xi2Systems
76’-80’Box 3Xi2Systems
0-72’Box 2Xi2Systems
76’-80’Box 3Xi2Systems
0-72’Box 2Xi2Systems
76’-80’Box 3Xi2Systems
30”Anchor*
Xi2Pier
Placement
3rdSystem
Placement
(WhenNeeded)
*-30”anchorwithverticalstraporframetiewithstabilizerplate,within10’ofendofunitonsinglesections.
NOTE:Wallheightsaretheeaveheightforabuildingwithoutsolidskirting.Ifsolidskirtingisinstalled,addthe
skirtingheightandusethatsumasthewallheight.Tearawayskirtingsuchasvinylisnotconsideredsolidskirting.
Diagramrepresentssinglesectionupto16’width,doublesectionupto32’width,andtriplesectionupto48’.
For multiple section of units, determine the number of systems based on each group of 3 modules, with the
remainder based on a double or single section (without anchors).
Page4of4