Installation Guide
Page 17
Installing CableRail by Feeney
® 
for AZEK Rail
ATTACH QUICK-CONNECT AND QUICK-CONNECT SWIVEL FITTINGS
•  Screw on Quick-Connect fi ttings snuggly against Post Sleeve onto one side 
of the railing and lock nuts onto hanger bolts on the other side.
4
INSERT AND THREAD CABLE
5
CUT CABLE TO LENGTH
6
•  Screw on Quick-Connect Swivel fi tting onto the Hanger Bolt with the lock 
nut already installed.
One side of the railing will be 
only Quick-Connect fi ttings, the 
other side will be Quick Connect 
swivel fi ttings and lock nuts.
•  When all of the hardware is in place, insert one end of the    
 Cable into the Quick-Connect fi tting.
•  Feed the Cable through the Intermediate Baluster (or 
 through posts) with a lacing needle.
CUT CABLE TO LENGTH
 Feed the Cable through the Intermediate Baluster (or 
 through posts) with a lacing needle.
Lacing Needle
Unscrew the Quick-Connect 
swivel fi tting from the post to 
measure length of cable
a
Trim Cable at the fi rst 
cut line on Quick-
Connect Swivel Fittings
Insert Cable into 
Quick-Connect 
swivel fi ttings
b
c










