Installation Guide
Page 24
Installing CableRail by Feeney
®
 Stairs for AZEK Rail
Leave about 1” of machine thread 
exposed for cable take-up.
PRE-DRILL THROUGH POST SLEEVES
• Drill a 1/4” hole through both 
the Post and Post Sleeve at 
stair angle.
2
1/4”
DRIVE IN HANGER BOLTS
3
• Screw Hanger Bolts into the 
pilot holes at the same angle of 
the stairs using the Hanger Bolt 
Installation Tool.
Top Anchor Post
1/4”
1”
Bottom Anchor Post
1/4”
1”
ATTACH QUICK CONNECT FITTINGS
4
• Place one Quick-Connect fi tting at one end and the Quick-Connect Swivel fi tting 
on the opposite end.
One side of the railing will be only 
Quick-Connect fi ttings, the other side will be 
Quick-Connect swivel fi ttings and lock nuts
Quick-Connect 
fi tting with Lock 
Nut
On the side with the lock nuts, screw on 
the Quick-Connect fi ttings after the lock 
nuts, onto the hanger bolts










