Installation Guide

Page 20
Installing AZEK Rail Stairs with CableRail by Feeney
®
Pre-drill 7/64”
#8 x 3/4” Coated
Screws
Center screw
aligned with rail
centerline
Pre-drill 7/64”
4
PREP BOTTOM SUPPORT RAIL
• Trim and Attach Foot
Blocks.
Pre-drill 7/64”
#8 x 3” Green
Coated Screws
Pre-drill through
Bottom Support Rail
with 3/16” bit
Bottom Support
Rail
#8 x 3” Coated
Screws
• Attach Mounting Brackets to
Bottom Support Rail.
For sections up to 6’: Place one Foot
Block in the center of the rail.
For sections 6’ to 8’: Space two Foot
Blocks approximately at 1/3 intervals
on the rail.
4
Brackets must be
installed to the stair
tread side of the rail.
5
INSTALL BOTTOM SUPPORT RAIL
Secure Mounting Brackets.