Installation Guide

Page 38
Installing AZEK Rail Stairs with Glass Infi ll
INSTALL TOP RAIL AND POST CAPS
Attach Post caps using exterior grade caulk applied to the underside of the cap.
11
#8 x 3”
Coated
Screws
#8 x 3”
Coated
Screws
3/16” Pre-drill
through
existing holes
in Top Glass
Channel.
Screws must be 3” to
attach the Top Rail on stair
sections.