Installation Guide

Page 6
8
INSTALL TOP RAIL
AND POST CAPS
Measure and cut Top Rail to
length. Trim both ends for a
clean cut.
Attach Post caps using exterior
grade caulk applied to the
underside of the cap.
Caution: Screws must be 1 3/4” so they won’t go through the Top Rail on straight rail sections.
Post Cap
Top Rail
Pre-Drill 3/16”
#8 x 1 3/4” Coated Screws
Installing RadianceRail
®
with Balusters