Instructions / Assembly

4.
Insert a baluster without a tab (Figure 9 
shows notched baluster with tab) into the 
rst and last baluster holes of the installed 
bottom rail (Fig. 6). Set the top rail in 
place by inserting these balusters into the 
corresponding holes in the top rail. For ease 
of measurement, place the top rail to the 
side of the post or mounting surface as in 
Figure 6.
Adjust for plumb (Fig. 7) ensuring sufcient 
clearance (minimum of 2 
5
/
8
" measured 
horizontally) between the rst baluster hole 
and the post or mounting surface at each 
end.
Trace the post or mounting surface onto 
each rail end and mark 
1
/
8
" short to allow for 
expansion (Fig. 8). The rail can now be cut 
at these marks.
5.
Insert a baluster into each baluster hole 
of the bottom rail. Each kit contains 4 to 
6 notched balusters (Fig. 9); space them 
evenly throughout each section.
Set the top rail in place by inserting the 
rst baluster (at the upper post) into the 
corresponding baluster hole of the top rail, 
and work toward the bottom (Fig. 10).
6.
Slide a bracket onto each end of the top rail 
as shown pointing toward the rail ends (Fig. 
11).
Check for proper t and attach to the 
mounting surface using the appropriate 
mounting hardware (see step 3) for your 
application (Fig. 12). 
Pre-drill using a 
1
/
8
" drill bit and install a 
supplied rail set screw through the side of 
each bracket to secure the rail in place 
(Fig. 13).
7.
Insert button caps (E) over set screws (C) 
and snap the bracket plugs (D) in place. 
(Fig. 14). If using a Titan steel post, snap 
trim rings around bottom ange of support 
post. Attach post cap, sold separately, 
using vinyl adhesive.
(Fig. 6) (Fig. 9) (Fig. 12)
(Fig. 7) (Fig. 10) (Fig. 13)
(Fig. 8) (Fig. 11) (Fig. 14)
Tab
Notched baluster


