Manual

Installation Manual
EHeat-IOM-1.0 6-1-01
Electric Coil Installation, Operation, and Maintenance Man ual
(For use with Titus Electric Coils manufactured after June 2 001)
General Information
All fan terminals with electric coils are ETL listed.
All single duct electric coils are ETL listed.
All electric coil control enclosures meet NEMA 1.
Single point power connection.
Installation
All terminal units with electric coils are designed to be
mounted in a horizontal plane with regard to the UP arrow
marked on the product label.
Always inspect electric coils for damage prior to applying
power.
Use copper conductors only.
All field wiring must conform to NEC and local building
codes.
Phase rotation of the incoming power is recommended
when connecting three phase electric coils to balance
building loads.
Always allow a minimum clearance of 36 in front of all
electric coil enclosures.
All terminal units must be properly grounded per NEC 424-
14 and 250.
Always check product label for voltage and current data to
determine proper wire size and current protection.
These recommendations are not meant to preclude NEC
requirements or local building codes that may be
applicable, which are the responsibility of the installing
contractor.
Fan Terminal Unit with Heater
Single Duct Terminal Unit with Heater
CAUTION
ELECTRIC SHOCK MAY RESULT
1. DISCONNECT POWER BEFORE
SERVICING UNIT.
2. DO NOT OPERATE UNIT WITHOUT
CONTROL COVER INSTALLED.