Installation Guide

2. PREPARATION BEFORE INSTALLATION
1. Please read the installation manual carefully before
installation.
2. Installation work must be performed by a professional
installer.
3. Installation tool
1. When you open the product packaging, please check the
product and accessories at first. If there is any discrepancy,
please contact the company or our distributor immediately.
2. The hot and cold water supply pipe of the faucet must be
properly connected.
When facing the front of the faucet, the hot water supply is on
the left and cold water supply is on the right. Incorrect
connection will cause permanent damage to the cartridge.
5. The water pressure of the faucet is 0.05MPa-1.0MPa
(including cold water and hot water pressure).
Applicable water temperature range: 39- 194
3. If the accessories to be changed without affecting the use,
we will not make a prior notice.
4. The impurities in the water supply pipe must be cleared
before installation to avoid blockage.
1. INSTALLATION PRECAUTIONS
1
5. TECHNICAL DRAWING OF DRILLING SIZE
1. The size of the embedded box that needs to be drilled
is 5.2"*6.3".
2. The depth of the embedded box is 2.2"~3".
It's better to drill the depth of 2.2"for blank wall.
6.3"
5.2
"
1.5"
wall
Tile surface
2.2"
3"
Hot water Cold water
Handle shower
outlet water
Top shower
outlet water
5
6. PIPE CONNECTION
1. Please drill the holes on the wall for the main body
embedded part, hot and cold water inlet pipes as well as
shower arm connection pipes according to the basic product
dimension drawing as below.
2. Please make hot and cold water inlet pipe, the mixed water
outlet pipe connect with control valve,and tighten with the
wrench.
Be sure to discharge the sewage in the pipe
before connecting the water supply pipe,
avoid clogging and damage the valve
cartridge caused by impurities.
6
7. WATER TESTING AND SEALING TESTING
2. Block each outlet pipe with a stopper then open the cartridge
to check if the pipe joint is well-sealed and the pipe condition
under pressure to ensure no leakage.
Testing Purpose: Flush the impurities and sludge in the
pipeline to avoid clogging and affect the effluent functions.
1. After the pipe connection is completed, open the protective
panel and cover, and then open the cartridge, flush the pipeline;
then close the cartridge to check the pressure resistance and
sealing performance of the pipeline, make sure there are no
leakage.
Hot water Cold water
Handle shower
outlet water
Top shower
outlet water
7
3. TWO FUNCTION CONCEALED FAUCET
ACCESSORIES LIST
2
10
1
9
Diverter handle
1
8
1
7
6
Cover board
1
Reducer
Control valve
on/off handle
3
1
2
1
1
In-wall box
1
Quantity
Number
Description
5
1
1
4
1
1
1
1
1
11
12
13
14
Ptfe tape
Screw set
Handle shower
Shower hose
Shower head
Shower arm
Cover arm
Shower hook
9
10
11
12
13
14
4
5
1
2
3
8
7
6
4. TECHNICAL DRAWING OF PRODUCT
3
9.8"
2.68"
7"
4
1
.6
80"
L
88"
47"
L
63"
35"
L
39"
2.2"
L
4-1/2-14NPT
1
/
2
-
1
4
N
PT
1/2-14NPT
0.87"
16"