Instructions / Assembly
13
15
16
17
18
19
20 21
22
TOOLS AND PARTS
1X Table Top
1X Front Panel
1X Back Panel
1X Door Panel
1X Side Panel
1X Gas Cylinder Base
1X Stiffener Frame
2X Brackets
1X Burner With Cnotrol
Panel
1X Cover Lid
2X Cover Lid Ring
2X Plastic Cylinder
1X Glass Beads
2X M4×8 Bolt
4X M6×10 Bolt
10X M6×15 Bolt
6X M6X30 Bolt
6X M6X35 Bolt
26X Flat Washers
Please assemble
the fire pit on the
carton or carpet
to avoid scratch.
1X Screwdriver
1X Allen Wrench
Estimated time for assembly: 30 minutes.
7