Installation Manual
Table Of Contents
- X-22 Excavator Indicate System Installation and Calibration Manual
- Table of Contents
- Introduction
- Installation and Calibration
- Getting Started
- Step 1: Charge the Sensors
- Step 2: Attach the Brackets
- Step 3: Attach the Mast for the PitchRollCompass
- Step 4: Attach the X-22 Display
- Step 5: Measure the Excavator
- Step 6: Entering the Sensors on the X-22 Display
- Step 7: Attach the Sensors to the Excavator
- Step 8: Calibrate the Sensors
- Step 9: Measure and Calibrate the Buckets
- Finding Your Way Around the Software
- Before You Start to Dig
- Important Information On Use
- Machine and Bucket Measurements
- Getting Started
- Troubleshooting
- The X-22 Display is not responding, what should I do?
- The sensors are not responding, what should I do?
- A sensor is damaged, what should I do?
- How do I recalibrate a sensor?
- The system is not measuring accurately, what should I do?
- The compass is measuring incorrectly, what should I do?
- The laser sensor is not working, what should I do?
- Specifications
- Safety Warnings
- Regulatory Information
- Warranty Terms
- Back Cover
Installation and Calibration
P/N 7010-1019
2-19
Figure 2-21. Serial Number Label
Step 7: Attach the Sensors to the
Excavator
Now you are ready to attach the sensors to the excavator. Slide the
boom sensor into the bracket you have attached to the boom, the arm
(stick) sensor into the bracket on the arm and the bucket sensor into
the bracket on the control stick. If you have a PitchRollCompass
sensor, an ArticBoom sensor, and/or a Tilt sensor, then attach them in
the same manner.