Installation Instructions

3
InstallingtheRemoteControl
BoxandBrackets
Partsneededforthisprocedure:
1Remote-controlbox
2Remote-controlbracket
4
Capscrew(8x25mm)
8
Washer(8mm)
4
Nut(8mm)
4
Locknut(8mm)
Procedure
1.Removeanddiscardthecontrolleversandthebracket.
2.Mount1remote-controlbracketonthemachine,as
shown.
7 6 5
2
4
G025406
8
321
g025406
Figure17
1.Nut(8mm),25.Locknut(8mm),2
2.Washer(8mm),4
6.Umbilicalcableassembly
3.Capscrew(8x25mm),2
7.Remote-controlbox
4.Remote-controlbracket8.Powercable
3.Mounttheotherbracketinasuitablelocationinthe
cabofthetractor.
Important:Refertotheinformationfrom
thetractormanufacturersothatthebracket
installationdoesnotcompromisethesafetyofthe
ROPS.
4.Connectthepowercableintothe12-voltsocketinthe
cabofthetractor.
10