Operator's Manual
g011213
Figure5
1.Positive(+)batterycable2.Negative(–)batterycable
Important:Ifyoueverremovethebattery,
ensurethatthebatteryclampboltsare
installedwiththeboltheadspositionedon
thebottomsideandthenutsonthetopside.
Iftheclampboltsarereversed,theymay
interferewiththehydraulictubeswhenyou
shiftthecuttingunits.
6.CoatbothbatteryconnectionswithGrafo112X
skin-overgrease(ToroPartNo.505-47)orlight
greasetopreventcorrosion.
7.Slidetherubberbootoverthepositiveterminal
topreventapossibleshortfromoccurring.
8.Installthebatterycover.
4
InstallingtheRollBar
Partsneededforthisprocedure:
1Roll-barassembly
4Flange-headbolts
4Locknuts
1Hoseclamp
Procedure
Important:Neverweldormodifyarollover
protectionsystem(ROPS).Replaceadamaged
ROPS;donotrepairorreviseit.
1.Lowertherollbarontothetractionunitmounting
brackets,aligningthemountingholes.Ensure
thattheventtubeontherollbarisontheleft
sideofthemachine(Figure6).
g011160
Figure6
1.Rollbar4.Fuellineventtubehose
2.Mountingbracket5.Hoseclamp
3.Venttube
2.Secureeachsideoftherollbartothemounting
bracketswith2angeheadboltsandlocknuts
(Figure6).Torquethefastenersto81N∙m(60
ft-lb).
3.Securethefuellineventhosetotheventtube
ontherollbarwiththehoseclamp.
CAUTION
Startingtheenginewiththefuellinevent
hosedisconnectedfromtheventtube
willcausefueltoowfromthehose,
increasingtheriskofreorexplosion.
Areorexplosionfromfuelcanburn
youandothersandcancauseproperty
damage.
Connectthefuellineventhosetothe
venttubepriortostartingtheengine.
5
InstallingtheFrontLift
Arms
Partsneededforthisprocedure:
2
Liftarms
2Pivotrod
2
Bolt(5/16x7/8inch)
Procedure
1.Removethe2boltsthatsecuretheliftarmpivot
shaftlinktotheliftarmpivotshafts,andremove
12










