Operator's Manual

andretainthepivotshaftlinkandbolts(Figure
7).
g011161
Figure7
1.Liftarmpivotshaftlink2.Liftarmpivotshaft
2.Insertapivotrodintoeachliftarmandalignthe
mountingholes(Figure8).
g011162
Figure8
1.Liftarm
2.Pivotrod
3.Securethepivotrodstotheliftarmswith2bolts
(5/16x7/8inch).
4.Inserttheliftarmsontotheliftarmpivotshafts
(Figure9),andsecureeachwithaliftarmpivot
shaftlinkandboltspreviouslyremoved.
Note:T orquetheboltsto95N∙m(70ft-lb).
g011966
Figure9
1.Liftarm,right
4.Mountingpin
2.Liftarm,left5.Liftcylinder
3.Retainingring
6.Spacers(2)
5.Removetherearretainingringssecuringthe
mountingpinstoeachendoftheliftcylinder.
6.Securetherightendoftheliftcylindertothe
rightliftarmwithapinand2spacers(Figure9).
Secureitwitharetainingring.
7.Securetheleftendoftheliftcylindertotheleft
liftarmwithapin.Secureitwitharetainingring.
6
InstallingtheCarrier
FramestotheCuttingUnits
NoPartsRequired
Procedure
1.Removethecuttingunitsfromthecartons.
Adjustthemasdescribedinthecuttingunit
operatorsmanual.
2.Positionafrontcarrierframe(Figure10)onto
eachfrontcuttingunit.
13