Operator's Manual

14
Setup
Note: Determine the left and right sides of the machine from the normal operating position.
Note: Use this chart as a checklist to ensure that all parts necessary for assembly have been received. Without these parts,
total set-up cannot be completed. Some parts may have already been assembled at the factory.
Description
Qty. Use
Locking hood latch
Lockwasher
Nut
Key
Hood latch bracket
Hood latch strap
Capscrew, 1/4 x 3/4 inch
Flat washer, 9/32 x 5/8 inch
Locknut, 1/4 inch
1
1
1
1
1
1
4
4
4
Mounting the hood latch for CE
Capscrew, 3/8 x 1 inch
Flange nut 1/4 inch
1
1
Attaching the tipper chains to the front cutting
unit
Flange head capscrew, 5/16 x 5/8 inch 1 Replacing the floor panel fastener for CE
Counterweight
O–ring, large
5
10
Mounting the counterweights and motors to
cutting units
Lynch Pin
Steering Pin
5
5
Mounting the cutting units to the traction unit
Diagnostic ACE display overlay 1 Use for diagnosing machine malfunctions
Guage bar
Screws
Wingnuts
1
2
2
Use to set cutting units
Hydraulic filter 1 Change filter after first 10 hours of operation
EEC decal
EEC certificate
1
2
Affix to machine
Blank service decal 1 Affix to machine (International only)
Operator’s manual (traction unit) 2 Read before operating the machine.
Parts catalog 1