Service Manual

Table Of Contents
InstallingtheSteeringControlValve(continued)
3.Applyloctitetofour(4)socket-headscrews.Slidethesteeringcontrolvalve
inputshaftintothesteeringcolumnuniversaljoint.Positionthecontrol
valvewiththeportstowardfrontofthemachine.Securethesteeringcontrol
valvetothesteeringcolumnwiththe4socket-headscrews.T orquethe
socket-headscrewsto8to11N·m(6to8ft-lb)inacriss-crosspattern.
4.Positionthesteeringcolumnassemblytothemachine.Securethesteering
columninplacewiththe2socket-headscrewsand2angenutsatrear
twomountingholes.
5.Removethecapsandplugsthatwereinstalledtothehydrauliclinesand
ttingsduringtheremovalprocess.
6.LubricatenewO-ringsandusethelabelsthatyouattachedduringvalve
removaltoconnectthehydrauliclinestothettingsonthesteeringcontrol
valve.Tightentheconnections;refertoInstallingtheHydraulicHoseand
Tube(O-RingFaceSealFitting)(page6–11).
7.Positionthesteeringcolumnbrace(item12inFigure184)tothemachine
andsecurewiththe4ange-headscrewsand4angenuts.
8.Slidetherubberbellowstothebottomofthesteeringcolumn.
9.Placetherubberbushingsandspacersintotheholesoftheshroud(Figure
185).Positiontheshroudinplaceandsecurewiththeremovedfasteners.
10.Checkthehydraulic-uidlevelinthehydraulictankandaddcorrectquantity
ofuidifnecessary;refertotheOperator’sManual.
11.Operatethemachinefunctionsslowlyuntilairisoutofsystem;referto
ChargingtheHydraulicSystem(page6–151).
HydraulicSystem:ServiceandRepairs
Page6–224
Reelmaster
®
5410/5510/5610Series
15216SLRevE