Operator's Manual

Figure73
1.Pumprodjamnuts2.Pumpcontroltube
5.Afterwheelrotationceases,tightenjamnutsto
secureadjustment.
6.Stoptheengineandreleasetherightbrake.Remove
jackstandsandlowerthemachinetotheshopoor.
Testdrivethemachinetomakesureitdoesnotcreep.
CheckingtheRearWheel
Toe-In
ServiceInterval:Every800hours/Yearly(whichever
comesrst)
1.Measurethecenter-to-centerdistance(ataxleheight)
atthefrontandrearofthesteeringtires.Thefront
measurementmustbe1/8in.(3mm)lessthanthe
rearmeasurement(
Figure74).
Figure74
1.Frontoftractionunit3.Centertocenterdistance
2.1/8inchlessthanrearof
tire
2.Toadjust,removethecotterpinandnutfromeither
tierodballjoint(Figure75).Removetierodball
jointfromaxlecasesupport.
Figure75
1.Tierodclamp2.Tierodballjoint
3.Loosentheclampsatbothendsofthetierods
(Figure75).
4.Rotatethedetachedballjointinwardoroutward
one(1)completerevolution.Tightenclampatloose
endoftierod.
5.Rotatetheentiretierodassemblythesamedirection
(inwardoroutward)one(1)completerevolution.
Tightenclampatconnectedendoftierod.
6.Installtheballjointintheaxlecasesupportand
tightenthenutngertight.Measuretoe-in.
7.Repeatprocedureifnecessary.
8.Tightenthenutandinstallanewcotterpinwhen
theadjustmentiscorrect.
49