Operator's Manual

6.Slidethecuttingunitunderthepullframewhile
hookingthelifthoopontotheliftarm.
7.Slidethesleevebackoneachballjointreceiverand
hookthereceiverontothecuttingunitballstud
(Figure17).
Figure17
1.Pulllinkextension3.Balljointreceiver
2.Pullarm
8.Mountthebasketontothecarrierframe.
9.Adjustthepulllinksuntilthereis1/16to1/8in.
(2to3mm)clearancebetweenthelipofthebasket
andthereelblades.Makesurethebasketlipsare
equidistantfromthereelbladesallthewayacross
thereelblades.
10.Assemblethemountingscrewsforthereeldrive
motortoeachcuttingunit.Leaveapproximately
1/2in.(13mm)ofthethreadsexposedoneach
mountingscrew(Figure18).
Figure18
1.Screws
2.Drivemotor
11.Usingahandpumpgreasegun,llthecavityatthe
endofthecuttingunitwith#2generalpurpose
grease.
12.Coatthesplineshaftofthemotorwithclean
greaseandinstallthemotorbyrotatingthemotor
clockwisesothemotorangesclearthestuds.
Rotatethemotorcounterclockwiseuntiltheanges
areencirclingthestuds(Figure18).
13.Tightenthemountingbolts(Figure18).
9
AdjustingtheTransportHeight
NoPartsRequired
Procedure
Checkthetransportheight(Figure19&Figure20)and
adjust,ifrequired.
1.Positionthetractoronalevelsurface.
2.Oncuttingunitsequippedwithachainlinkora
straightlifthook(Figure19&Figure20,insets)
verifythatthedistancefromthetopofthecarrier
frameadjustingscrewtothebackofthecarrier
frameis7/8inch(22mm).Ifthedistanceisnot
7/8inch(22mm),proceedtostep4.Ifthecutting
unitisequippedwithanoffsetliftlink(Figure21),
proceedtothenextstep.
20










