Operator's Manual

holdersinthemachineframe.Damagetothe
motorsorhosescouldresult.
6.Ensureeachcarrierframeisatthesameheightfrom
theground.Iftheyare,proceedtostep8.
7.Ifthecarrierframesarenotatthesameheight,loosen
thejamnutonthecarrierframeadjustingscrew
(Figure19,Figure20andFigure21).Rotatethescrew
outwardtoraiseandinwardtolower.Tightenthejam
nutaftertheproperheightisobtained.
8.Rotatethetransportplateuntilitlocksthepullframe.
Tightenthescrews.
10
AddingRearBallast
Partsneededforthisprocedure:
40lb
Calciumchloride(purchaseseparately)
Procedure
ThisunitcomplieswiththeANSIB71.4-2004andEN836
Standardswhen40lbofcalciumchlorideballastisadded
totherearwheel.
Important:Ifapunctureoccursinatirewithcalcium
chloride,removetheunitfromtheturfareaasquickly
aspossible.Topreventpossibledamagetotheturf,
immediatelysoaktheaffectedareawithwater.
11
InstallEUDecals
Partsneededforthisprocedure:
1
Warningdecal(117–9537)
Procedure
IfthismachinewillbeusedintheEU,afxthewarningdecal
117–9537overEnglishwarningdecal(117–9536).
12
ReadingtheManualsand
ViewingtheTrainingMaterials
Partsneededforthisprocedure:
1
Operator'sManual(tractionunit)
1
EngineOperator'sManual(engine)
1
PartsCatalog
1
OperatorTrainingMaterials
1
Pre-deliveryInspectionSheet
1
Noiseratingcerticate
1
Certicateofcompliance
2Ignitionkeys
Procedure
1.Readthemanuals.
2.ViewtheOperatorTrainingMaterials.
3.Storethedocumentationinasafeplace.
20