Operator's Manual


  !  ! 
 6.. .+0- #44'/$.:
 6.. .+0- '95'04+10
 #.. ,1+05 3'%'+7'3
 :.10 $64*+0)
 2#%'3
 "#4*'3
+)63'
 Make sure all tires are inflated to 8-12 p.s.i.
!    
+) 
 Position traction unit on a level surface and lower
cutting unit carrier frames to the floor.
 Verify that there is 1/2" clearance between carrier
frame rollers and floor.
 If an adjustment is required, loosen jam nut on
carrier frame stop screw (Fig. 8) and rotate screw up or
down to raise or lower carrier frame. Tighten jam nut
after adjustment is attained.
 #33+'3 (3#/' 31..'3
 #33+'3 (3#/' 4512 4%3'8
+)*5 3105 *180
+)63'
15' If you are using a GREENSMASTER 3250-D in
hot climates, where ambient temperatures range from
70F (20C) to 120F (49C), or using it for heavyĆduty
use (mowing other than greens, such as fairways or
verticutting), TORO strongly recommends installation
of an hydraulic Oil Cooler Kit, Part No. 100-3166, to the
traction unit.
  !  !  +) 
15' When sharpening, setting heightĆofĆcut, or
performing other maintenance procedures on the
cutting units, store the cutting unit reel motors in
support tubes on front of frame to prevent damage to
the hoses.
! 
1 015 3#+4' 4642'04+10 51 53#042135
214+5+10 8*'0 5*' 3''. /15134 #3' +0 5*'
*1.&'34 +0 5*' 53#%5+10 60+5 (3#/' #/;
#)' 51 5*' /15134 13 *14'4 %16.& 3'46.5
 Remove cutting units from cartons. Assemble and
adjust per the Operator's Manual for the cutting units.
Use the Height Gauge bar from Loose Parts Kit to
adjust height of cut.
15' All cutting units are shipped with the counter
weight mounted to left end and drive coupler mounted
in the right end of cutting unit. To mount the cutting unit
in the right front position, proceed as follows:
A. Remove (2) capscrews and lockwashers
securing counter weight to left end of cutting unit.
Remove counter weight (Fig. 9, inset).
B. Remove snap ring securing drive coupler in
right bearing housing. Remove drive coupler.
C. Apply grease to I.D. of drive coupler. Install
drive coupler to left end of cutting unit with snap
ring.
D. Install counter weight to right end of cutting
unit with capscrews and lockwashers.
 1605'3 8'+)*5
 0#2 3+0)
 3+7' %162.'3
+)63'